Laserfiche WebLink
City of Santa Ana <br />Crary Gordon, PE <br />Structural Engineering Task Leader <br />Profile Summary <br />Education: BS, Civil Engineering, California State University, Chloo <br />Registration; Civil Engineer, California No. 42176 <br />Affiliations: American Public Works Association <br />American Society of Civil Engineers <br />r American Concrete Institute <br />Experience: 32 Years <br />Mr. Gary Gordon has 32 years of comprehensive experience, Including project management, design, and <br />construction management of bridge, roadway, traffic signal, waterline, sewer, drainage, and airport projects, <br />In 2015, Mr, Gordon was placed in charge of Wllldan' brldge and structural engineering team, With this new <br />assignment, he now oversees projects such as Mariposa County's rehabllltatlon/replacement of five bridges <br />that Is currently In the preliminary engineering phase. <br />i Mr. Gordon's career Includes serving as a staff member of the Shasta County Department of Public Works, <br />Caltrans Division of Structures, and the City of Fledding's Department of Public Works performing detailed <br />and complex design, construction management, and division management and supervision. Throughout his <br />career, Mr. Gordon's focus has been on the delivery of road and bridge projects and the various appurte- <br />nances associated with them. <br />Mr. Gordon has dealt with complex environmental compliance issues Involving CEQA and NEPA as well as <br />developed considerable experience with resource agency permitting Issues. The experience and insight <br />gained from working directly with these agencles have proven invaluable In understanding and appreciating <br />the varying needs of the different types of agencies that Wllldan serves and developing the best solutions <br />for those needs. <br />Relevant Project Experience <br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Callfor- <br />nin, Structural Engineering Task Leader responsible for responding to structural requests for Information <br />during construction and redesigning various structural elements to accommodate utility lines discovered <br />during oonstruotion. Performance of these responsibilities requires expertise and knowledge In various <br />structural building codes such as ACI, AASHTO, and CBC as well as construction practices and principles. <br />Wllldan provided civil and traffic engineering design and other appurtenant services for safety Improvements <br />at the main gate entrance. Improvements involved road widening, guardhouse relocation and reconstruc- <br />tion; grading to accommodate the roadway widening and landscaping; Installing upgraded lighting, ADA - <br />compliant curbs and ramps, retaining and monument walls; widening the right -turn pocket and installing a <br />medlan;'add installing street striping and signage within Caltrans' right-of-way. <br />Lakewood Boulevard/Dol Amo Boulevard Piot Spot Intersection Improvement, City of Lakewood, <br />California. Structure Engineering Task Leader responsible for overall structural design of culvert structural <br />and retaining walls. Performance of these responsibilities requires expertise and knowledge in various de- <br />slgn codes such as AD] and LACFCD for work within a concrete channel under Los Angeles County Flood <br />I Control District jurisdiction. The project entailed widening Lakewood Boulevard north of Del Amo Boulevard; <br />modifying/replacing median islands; widening Del Amo Boulevard; modifying traffic signals; relocating street <br />lights per street/medtan island modifications; modifying a box culvert/channsl wall; and extending a Class 11 <br />bike lane. <br />,i <br />.I <br />Comprehensive. Innovative,Trusted. Propaselfor On•QallEngineering, is <br />_I RFP No.17.083 <br />