Laserfiche WebLink
If Wllidan believes that further detailed environmental studies and reports are needed to comply with CEQA and r <br />or National Environmental Protection Act (NEPA), subject to confirmation by City Staff, Wllldan will meet and dis- <br />cuss with the applicable resource/regulatory agencies to confirm the necessary work effort and Identify the cost <br />and schedule to prepare the environmental reports, applications for <br />permits and obtain clearance through all applicable agencies as add)- a Task 3 Deliverables <br />Ilona[ scope of work. As pan of Clean Water Act, a NPDES permit CEQA Categorical Exemption <br />may be required for alternate discharging during well rehabilitation. Form <br />Task 4 — Preliminary Engineering — Option A and Option B rn <br />Subtask 4.01 — Site Visit and Evaluation. Visual inspection Is Important for quality assurance and ensures a � J <br />site facilities and constraints. Willdan will catalog existing conditions and fadiftles through photographs and field <br />C Ity of Santa Ana <br />L <br />Submit So-, 60-, and 100 -percent plans to those utility companies with facilities In Immediate project area for <br />review and comment, <br />• Coordinate with utility companies to implement upgrade of facilities (upon request), as needed, within project <br />IJ <br />limit and Maintain contact log. <br />• Determine any utility upgrades or installations that will be required to service existing and proposed Improve. <br />ments and coordinate Installation of required upgrades with each aflected utility company <br />I <br />• Lead efforts to Identify ownership of unknown utility lines <br />Task 3 — Environmental Compliance and Permits — Option A and Option B <br />I <br />it Is anticipated that the projects will qualify for Categorical Exemption Section 16301 Class 1(c) under existing <br />c <br />highways and streets improvements that allows for roadway Improvements for the purpose of public safety and <br />has no significant effects on the environment, Wllldan will perform Its due diligence as part of this task to verify <br />-, <br />exemptions criteria set by California Environmental Quality Act (CEQA) under Article 18 of Categorical Exemp-, <br />j <br />tions and make necessary recommendations to the City. The City's Planning Division will make the final environ- <br />mental determination. To satisfy CEQA requirements forthe project, Willdan will prepare a notice of exemption <br />s <br />for the City's use. We will assist with posting of the notice and with filing the Notice of Exemption with the County <br />Clerk, <br />If Wllidan believes that further detailed environmental studies and reports are needed to comply with CEQA and r <br />or National Environmental Protection Act (NEPA), subject to confirmation by City Staff, Wllldan will meet and dis- <br />cuss with the applicable resource/regulatory agencies to confirm the necessary work effort and Identify the cost <br />and schedule to prepare the environmental reports, applications for <br />permits and obtain clearance through all applicable agencies as add)- a Task 3 Deliverables <br />Ilona[ scope of work. As pan of Clean Water Act, a NPDES permit CEQA Categorical Exemption <br />may be required for alternate discharging during well rehabilitation. Form <br />Task 4 — Preliminary Engineering — Option A and Option B rn <br />Subtask 4.01 — Site Visit and Evaluation. Visual inspection Is Important for quality assurance and ensures a � J <br />site facilities and constraints. Willdan will catalog existing conditions and fadiftles through photographs and field <br />notes to be used as a reference during design. <br />U <br />An Initial assessment will be performed to evaluate the existing condition of the water well. Based on the Initial <br />evaluations, rehabilitation options will be proposed. The entire well will have to pulled and the casing will have to <br />be video inspected. Common causes of reduced well capacity could be sanding, rupture of casing, mineral build- <br />IJ <br />Lip, heavy encrustation, screen damage, screen clogging or mechanical failures of the pump. Depending on the <br />assessment, rshabllltation could Include brushing and bailing casing, replacing ruptured casing, adding an elon• <br />gated nozzle to bull to reduce sand flow, chemical treatment, remachine the pump and or rewind. After the initial <br />evaluation, Willdan will work with City's current maintenance and repair contractor to rehabilitate the wall or will <br />work with the City to bid out the project. <br />I <br />Subtask 4.02 --Field Survey and Right -of -Way. Willdan will perform a field survey to ensure the accuracy <br />c <br />and constructability of the final construction plans, For this project the survey will; <br />• Establish right-of-way through record research and/or survey. <br />-, <br />• Option A: (around Survey to map the existing facilities and utility Subtask 4.02 Deliverables <br />j <br />alignment, rho utility survey will Include manholes, covers, and One electronic copy of all field sur - <br />depth of cover when required, vey data In Mlcrostatlon Vel format <br />s <br />• Option B: Topographlo/ground survey will be required to deter- <br />mine existing grades and facilities. To ensure acceptable cross -slopes full street sections will be surveyed <br />and analyzed at 26 -foot intervals, driveways, and at approaches. The topographic survey shall extend a mInl- <br />mum of 200 feet beyond limits of construction within the public right-of-way, where possible. Full street sec- <br />it <br />tions Include obtaining field data at all control or critical points, such as CL, BCR, ECR, and at any grade <br />breaks between lips of gutters, andfor edges of pavement, and flow Ilnes; Where applicable to the project <br />scope, surveyof private property improvements shall be included. <br />Subtask 4.03 — Geotechnical Investigation and Pavement Rehabilitation Strategies. All geotechnical <br />IJ <br />Investigation and analysis shall be performed by a state-lloensed geotechnical engineer with expertise In pave- <br />ment design. Willdan will conduct geotachnioal investigations to measure the existing pavement sections and <br />collect representative samples of subgrade soils for laboratory testing as described below. The task work In- <br />4 1 <br />cludes: <br />Proposal for On•Oall Engineering, <br />Comprehensive, Innovative, Taisted, <br />7� <br />RFP No. 17-083 <br />wJ <br />