Laserfiche WebLink
ON -CALL ENGINEERING SERVICES <br />WAtm Resolne. -opawA K2 <br />? <br />Pipeline Experience <br />During the last 16 years, our project learn has been involved in the design of more than 100 <br />miles of water, recycled water, and sewer mains within fully developed areas having extensive <br />traffic control and utility conflicts, On Page 6 of our On -Call Engineering Services $OQ, <br />submitted to the City on October 26, 2017, Is a Iist of many pipeline projects designed by our <br />h <br />project team.. <br />City of Santa Ana Experience <br />�a <br />We believe that our best reference of our experience Is our past performance on projects thatT <br />we have completed for the City. We are confident that these past projects with the City will <br />'s <br />attest to our technical excellence, responsive staff, and our completer. understanding of the City's <br />facilities. <br />� <br />Summarized below is a quick summary of the applicable projects that Tetra Tech has previously <br />0 <br />completed for the City: <br />i <br />p Pump Station/well Projects - South Station Modifications, Well No. 34 Modifications, Well <br />�.,. <br />No. 39 and Well No. 36, Well No. 24 electrical upgrades, and Well No, 32 Rehabilitation <br />-t <br />Water Main Replacement Projects M Bristol Street Widening, Centennial Park, Warnert <br />Industrial, Mid City, Pico -Lowell and Central City Water Main Repiaeements_P <br />• Sewer Main Replacement Projects - Westminster and McFadden Sewer Replacemonts <br />r Lift Station Projects - Can Lorenzo and Maxine Lift Station Emergency Bypass <br />We are committed to providing the City with the same high quality service that we provided on <br />these previous projects, <br />Similar Projects <br />The following are three projects that are similar to the sample project: <br />t' <br />• Mid -Basin injection Centennial Park Project (OCbYp): These facilities Include four (4) <br />submersible backflush pumps and motors within a vault structure, The malt? relevance is <br />that 0CW0 was drilling and equipping well facilities within the City of Santa Ana (Centennial <br />Park) and our services included obtaining the necessary City Permits, <br />• Elizabeth Reservoir and Booster pump Station and Water Well No. 29 (City of South <br />f, <br />Gate); This project Included the design of the drilling and equipping of Well No. 29, <br />corresponding disinfection equipment and replacement of several thousand feet of pipe, <br />• Well No. 27 Drilling and Equipping (City of Orange); This project included the well <br />drilling and well equipping of a new potable water well, including an electrical and chemical <br />building for sodium hypochlorite treatment, <br />r• <br />The requested contact information is included on the following page (Client References). <br />SCHEDULE <br />Tetra Tech has the necessary resources to rapidly deploy and meet an aggressive project <br />?, <br />schedule. In addition, our project team has recent well experience that places our learn high on <br />the issues resolution learning curve. On the next page, we have identified the key schedule: <br />City ofPanta Ana -1S TETRA TECH <br />'. <br />