TETRATECH Thomas L. EppersManer
<br />on, PE
<br />treatment systems, and an emergency generator, The facility included the following
<br />buildinglenclosures: well building removable sound enclosure; pre-engineered, prefabricated
<br />precast concrete electrical building; and prefabricated fiberglass insulated building for the
<br />backwash pump enclosure,
<br />Plant 13 Booster Station Rehabilitation and Well 22 improvements, City of Lakewood,
<br />Lakewood, CA-- Project Managerfor plans, specifications and cost estimate for the
<br />replacement of a 4,800 gpm booster pump station and replacement of a 1,200 gpm well pump,
<br />In addition to the booster purnp station replacement, the construction was phased so the
<br />booster station was operational during construction.
<br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA— Project Manager for the
<br />preparation of the plans, specifications, cost estimate and construction services for the drilling
<br />and equipping of a potable water well in the City of Irvine, This project combined the well drilling
<br />and well equipping phases of the project together.
<br />Equipping of Well No. 39, City of Santa Ana, Santa Ana, CA — Project Manager for the
<br />design of the equipping of Well No 39 and corresponding piping and site Improvements,
<br />Well 78 Replacement, Irvine Ranch Water District, Irvine, CA -- Project Manager for the
<br />drilling and equipping of a recycled water well in the City of Irvine.
<br />Irvine Desaiter Project-- Potable Wells 76, 77,107, and 110, Irvine Ranch Water District,
<br />Irvine, CA Project Manager for the design and construction services of four potable wells
<br />Including drilling and equipping of each well.
<br />Burris Pump Station, Orange County Water District, Anaheim, CA— Project Manager for
<br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical
<br />turbine pumps delivering a maximum flow rate of 200 cfs to the Santiago Basins from Burris
<br />Basin, Work consists of reviewing the existing Burris Pump Station Evaluation Report, assisting
<br />OCWD with selecting a replacement option, performing final design of the selected option and
<br />providing bid and construction phase services. The project also included unique designs:
<br />190,000 cubic yards of earthwork to be completed prior to pump station construction, the
<br />construction of a 55 foot diameter by 55 foot high circular wet well which was computer and
<br />physically modeled during design for flow characteristics, and the construction of a 180,000
<br />gallon surge suppression system.
<br />Centennial Park Neighborhood Water Main Improvements, City of Santa Ana, CA — Project
<br />Dir%tor for approximately 20,000 linear feet of 8-inch PVC water main to replace existing water
<br />mains.
<br />Central City Water Main Improvements, City of Santa Ana, CA - Project Director for
<br />approximately 6,600 linear feet of 8-inch PVC water main to replace existing water mains.
<br />Pico. -Lowell Neighborhood Water Main Improvements, City of Santa Ana, CA -•Project
<br />Director for approximately 8,200 linear feet of 8- and 12-inch PVC water main to replace existing
<br />water mains.
<br />Page 2
<br />,
<br />
|