Laserfiche WebLink
TETRATECH Thomas L. EppersManer <br />on, PE <br />treatment systems, and an emergency generator, The facility included the following <br />buildinglenclosures: well building removable sound enclosure; pre-engineered, prefabricated <br />precast concrete electrical building; and prefabricated fiberglass insulated building for the <br />backwash pump enclosure, <br />Plant 13 Booster Station Rehabilitation and Well 22 improvements, City of Lakewood, <br />Lakewood, CA-- Project Managerfor plans, specifications and cost estimate for the <br />replacement of a 4,800 gpm booster pump station and replacement of a 1,200 gpm well pump, <br />In addition to the booster purnp station replacement, the construction was phased so the <br />booster station was operational during construction. <br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA— Project Manager for the <br />preparation of the plans, specifications, cost estimate and construction services for the drilling <br />and equipping of a potable water well in the City of Irvine, This project combined the well drilling <br />and well equipping phases of the project together. <br />Equipping of Well No. 39, City of Santa Ana, Santa Ana, CA — Project Manager for the <br />design of the equipping of Well No 39 and corresponding piping and site Improvements, <br />Well 78 Replacement, Irvine Ranch Water District, Irvine, CA -- Project Manager for the <br />drilling and equipping of a recycled water well in the City of Irvine. <br />Irvine Desaiter Project-- Potable Wells 76, 77,107, and 110, Irvine Ranch Water District, <br />Irvine, CA Project Manager for the design and construction services of four potable wells <br />Including drilling and equipping of each well. <br />Burris Pump Station, Orange County Water District, Anaheim, CA— Project Manager for <br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical <br />turbine pumps delivering a maximum flow rate of 200 cfs to the Santiago Basins from Burris <br />Basin, Work consists of reviewing the existing Burris Pump Station Evaluation Report, assisting <br />OCWD with selecting a replacement option, performing final design of the selected option and <br />providing bid and construction phase services. The project also included unique designs: <br />190,000 cubic yards of earthwork to be completed prior to pump station construction, the <br />construction of a 55 foot diameter by 55 foot high circular wet well which was computer and <br />physically modeled during design for flow characteristics, and the construction of a 180,000 <br />gallon surge suppression system. <br />Centennial Park Neighborhood Water Main Improvements, City of Santa Ana, CA — Project <br />Dir%tor for approximately 20,000 linear feet of 8-inch PVC water main to replace existing water <br />mains. <br />Central City Water Main Improvements, City of Santa Ana, CA - Project Director for <br />approximately 6,600 linear feet of 8-inch PVC water main to replace existing water mains. <br />Pico. -Lowell Neighborhood Water Main Improvements, City of Santa Ana, CA -•Project <br />Director for approximately 8,200 linear feet of 8- and 12-inch PVC water main to replace existing <br />water mains. <br />Page 2 <br />, <br />