NTt:TR TECH
<br />Mazes Kassar, PE
<br />Electrical/Instrumentation Load
<br />Mr, Mazen Kassar has more than 27 years of experience in
<br />Educat onr
<br />electrical engineering and Industry standard that include electrical
<br />KS., r_leotrical Engineering,
<br />engineering staff imnagement, project management, construction
<br />California state university, Long
<br />management and supervision, water and wastewater treatment,
<br />leach, 1990
<br />Petro -chemical design, and environmental soil and groundwater
<br />Registrationsicertificatiuns;
<br />treatment. His background Includes designing medium and low
<br />Professional Electrical Engineer
<br />voltage power distribution, designing instrumentation, control
<br />California, 1996, No,15809
<br />systems and SCADA systems for a wide -variety of projects, and
<br />General Construction, class B
<br />the installation of electrical systems for remediation projects,
<br />California, 2001t, No.777645
<br />Including soil vapor extraction systems and. groundwater pump-
<br />Contractor- 0-10 Electrical,
<br />and -treat systems. Other experience includes, working with utility
<br />California Class C - Specialty
<br />companies to provide new electrical service to new projects,
<br />20gp, No. msge
<br />working with local Building and Safety Departments to obtain Plan
<br />Check and construction permits; field trouble shooting of electrical
<br />Training and Certifications:
<br />and mechanical systems, system commissioning ant startup,
<br />ETAP Eleatrloal power Modeling
<br />problem solving, and managing an operation and maintenance
<br />Projeot Management I & iI
<br />department, He has strong knowledge in MS Office and
<br />Auto CAD 2006
<br />AutoCAD,
<br />GE and Allen Bradley PLC
<br />EXPERIENCE
<br />programming
<br />GEllntellutian and wpnderwtare
<br />Mid -Basin Injection: Centennial Perk Design Services,
<br />SCADA programming
<br />Change county Water District, Santa Ana, CA -- Electrical P
<br />vapor etextraction and
<br />responsible for the design of four Injection wells to be located
<br />Groundwater 1reatrnent
<br />within Centennial Park in the City of Santa Ana for Orange County
<br />OSHA 8-hour hazardous waste
<br />Water District, In addition to the engineering services for the four
<br />Operations Annual Refresher
<br />injection wells, the project includes the design of the supply
<br />Training, 2016
<br />pipeline, backflush pipeline, bridge crossing, two shared facility
<br />OSHA 0-hour Hazardous waste
<br />Sites, a monitoring well site, site improvements, and paving of
<br />Operations Site Supervisor
<br />park access roads and parking lots.
<br />Training,1992
<br />Lakewood Plant 13 Project, Lakewood, CA - Managing the
<br />OSHA 40-hour Hazardous
<br />electrical design for Plant 13 pump station upgrade. The design
<br />g p g
<br />waste Operations Training,
<br />consists of replacing the plant old MCC with new outdoor NEMA
<br />�98g
<br />3R MCC, installing new conduits and wires to the new pumps,
<br />Professional Affiliations:
<br />and relnstaliing the existing control and telemetry system, This
<br />Institute of Electrical and
<br />replacement upgrade requires Interfacing with Southern California
<br />Electronics Engineers IEEE
<br />Edison (SCE) and relocating the existing ATS,
<br />Office:
<br />Well 27 Equipping Plan, City of Orange, Orange, CA -
<br />Irvine, California
<br />Electrical Project Manager for the preparation of the plans,
<br />specifications and cost estimate for the equipping of a potable
<br />Years of Experience:
<br />water well. As part of the well equipping a generator room was
<br />27
<br />Installed for backup power.
<br />Years with Tetra Tech:
<br />Lakewood Well No, 22 Project, Lakewood, CA - Managing the
<br />Eight
<br />electrical design for well no. 22 pump upgrade. The design
<br />consists of replacing the old well pump 1/FD with new one and
<br />rewiring the new well pump,
<br />lags 1
<br />
|