Huitt-Zollars prepared plans, specifications, estimates, and the environmental revalidation <br />for the Alton Avenue Widening and Overcrossing at SR -55. The project is constrained in a <br />tight urban environment where right-of-way Impacts had to be evaluated on a case-by- <br />case basis. Major Southern California Edison lines paralleled the project area and were <br />included in the utility investigations. The project impacted an existing open trapezoidal <br />flood control channel, which was proposed to be relocated and put in a box culvert outside <br />of freeway right-of-way. The Army Corps of Engineers was consulted regarding jurisdiction <br />over this facility, Existing ramps were redesigned to join the widened freeway, The project <br />Included; <br />» Development of local street Improvements along 1.3 miles of Alton Avenue from Main <br />Street in Santa Ana to Gillette Avenue in Irvine <br />» Freeway widening along 1.5 miles of SR -55 from MacArthur Blvd, to Warner Ave <br />» Ramp modifications at MacArthur Boulevard and Dyer Road <br />» A new overcrossing and structure widening <br />» Design of NOV drop ramps and redesign of the NOV lanes on <br />SR -55 <br />RELEVANT DESIGN <br />COMPONENETS <br />PS&E <br />Ro6dwaya and Bridge <br />+ dvercrossing <br />• G�adfngendQaving <br />• Enviommental <br />Landscape <br />Detailed geometric studies, topographic surveys, and final construction documents were prepared <br />by Huitt-Zollars for this $5 million project to add one through lane in each direction on Oso Parkway, <br />right -turn -only lanes in each direction on Marguerite Parkway, and create double lett-tum lanes <br />in all four directions of the existing arterial highway intersection. Raised medians on all four legs <br />of the intersection were completely reconfigured. Design constraints Included access to existing <br />developments, an adjacent hillside slope buttress, major water pressure reducing station, and <br />other utility vaults and facilities. This project affected 4,600 linear feet of highway, three signalized <br />intersections, and included 1,700 linear feet of retaining walls. Construction plans, specifications, <br />and estimates were prepared for this $5 million project. The work of subconsultants for environmental <br />documentation, traffic engineering, landscape architecture, and cost estimating was coordinated by Huitt-Zollars. This project involved <br />relocation of numerous electrical, telephone, cable and gas utility facilities, and reinforcement of the underground vault for the pressure <br />reducing station. <br />L� a <br />RELEVANT RESIGN <br />COMPONENETS: <br />+ Road Widening <br />• Traffic Signals <br />• Signage & striping <br />• Retaining Walls <br />• Pavement Rehabilitation & Overlay <br />• Trak Contml/Construction Phasing <br />• Right -of -Way <br />• Storm Drain <br />• Design, Geometries & PS&E <br />• Private ProperlyAccess <br />Modifications <br />City of Santa Ana Civil Engineering Services: RFP 17-083 12 <br />