Laserfiche WebLink
KEY PERSONNEL RESUMES <br />MIGUEL HERNANDEZ,PE, PLS, QSD <br />Project Manager - 11uitt-7.olla is <br />Miguel Hernandez has more than 20years of experience in Public Works and is proficient with the design of <br />streets, highways, sewer, water, storm drain, grading, hydrologyand hydraulics. His experience combined <br />with his ability to communicate will make him a valuable asset to a project. As a Project Manager he <br />will be helpful in coordinating all design inclinations and finding the appropriate balance. When critical <br />deadlines need to be met his proven ability to work under pressure will be invaluable. <br />RELEVANT PROJECT EXPERIENCE <br />Mojave Solar Project - Hinkley, CA <br />Ensure all construction work conformed to applicable LORE, coordinated traffic detour plans, reviewed <br />QSP activities, prepared documents to initiate revisions to approved drawings, responsible for work load <br />reports and monitored progress of construction schedule. The project moved over 750,000 CY of soil <br />during the grading activities that required coordination with survey crows and grading contractor. To <br />protect the site from large storm events and balance dirt moving activity 111,000 LF of channel were cut. <br />The solar plant Included rehabilitation of six existing water wells and drilling of four new water wells. <br />Six existing water wells were used for construction water. After construction, two large existing wells <br />were retrofitted and connected to four now water wells to provide water for domestic and power plant <br />use. The two power plants included four water tanks total. <br />Farragut Avenue improvements - Moreno Palley, CA <br />Hernandez was the Project Manager for improvements that included sidewalk, curb, gutters, driveways, <br />drainage, access ramps, utility adjustments, short property walls, missing street lights, pavement <br />repairs, and accommodation of upgraded water line (built in advance by BSMWC) in order to enhance <br />safety and accessibility for commuters and pedestrians on Farragut Avenue from Sherman Avenue to <br />Ellsworth Street. <br />Jeffrey Road/Portola Parkway Street Improvements - Irvine, CA <br />Hernandez was the Project Manager for the civil design and survey of a new alignment of 1.5 miles of <br />Jeffrey Road and 1.0 mile of Portals Parkway. Work included roadway rehabilitation, electrical conduits, <br />cable/telephone improvements, right-of-way engineering, potholing, and grading. Work also Included <br />preparation of infrastructure plans, including storm drain design, 72 -inches to 10 -inches in diameter <br />over 10,000 feet of pipe, hydrology and hydraulic calculations, sewer plans, dry utilities, specifications, <br />and construction cost estimates. Jeffrey Road and Particle Parkway were designed for a six -lane highway <br />with raised medians, new curb and gutter to replace open ditch channels, pedestrian undercrossing. <br />Cerritos Avenue Cap Closure - Anaheim, CA <br />Hernandez was the Project Manager for this project located on Cerritos Avenue from Euclid Street to <br />approximately 600 feet east of Euclid Street. The project constructed a five foot wide AOA compliant <br />sidewalk and new storm drain laterals with catch basins. The work also included the construction of <br />block walls and fences. The new sidewalk eliminates the need for pedestrians to walk along the side of <br />the road. Cerritos is designated as a four lane secondary arterial by the County's Master Plan of Arterial <br />Highways (MPAH) with average daily traffic of 9,400 vehicles per day, The project will provide a safer <br />and better access for the school children and pedestrians in general. The services included right of way <br />acquisition. <br />See Section E.- Relevant Project Experience tar additional projects. <br />HL.IITT-A)L RS City of Santa Ana Civil Engineering Services: RFP 17-083 <br />3 <br />