Laserfiche WebLink
C4y ofSallt:aAna ,t <br />Orange Line Extension <br />Los Angeles Metrapollian Tranalt Authorltyl Client Contact, Scott McConnell, Project Manager <br />Brutoco Engineers and Constructors, Inc, <br />(218) 922.72$1 <br />One Gateway Plaza Pr%ot petew 2010 to 202 <br />Los Angeles,, CA 90012 Projeot Teem: ryrorre Peter, David Knell. Johnny <br />The deli g n -build MOL extension between Chats <br />Ghazal, John Hidalgo, Vanessa Munoz, <br />Mohasn Rahimian, Ross Khlebanl, Ray <br />worth and Canoga Station's in the San pernando Val- <br />Wellington, Michael Bustos, kennoth <br />ley along Canoga Avenue is a dedicated roadway <br />Krieger, Randy Shadowen, Bernardo <br />consisting of two 14 -foot travel lanes. At stations, the <br />Reyes, Suesna Barrlentos, Bryan Ngu- <br />busway lane widens to provide passing lanes for <br />yen, Shelia MoOradken, Robett Burch, <br />buses.. The 28 -foot wide roadway is within .the Metro <br />Chris Stone, Edward Cox, Christopher <br />right-of-way and Is, 100 feet wide In most locations — <br />Kelley, Ryan Moore <br />providing adequate, room for landscaping as well as space for <br />fences, privacy walls, drainage facfiitlesi and a biksway/pedes- <br />trlan path adjacent to the busway. <br />The busway was designed for future conversion to light-rail <br />transit service. A Class I bikeway that includes apedestrlan <br />path was designed and constructed within the Metro right-of- <br />way from the terminus of the. existing MOL bikeway/pedestriap <br />path at Canoga Avenue, north to Lassen Street and along Las- <br />Yi?i :,, flake <br />sen Street to connect within the existing bike path on the east <br />°^ .- •�°^4„e, <br />side of the existing Drowns Creek drainage channel. Street and <br />edestriancrossin swereIm roved on nine streets where the <br />p g p <br />Measures.,ProfeautlRlclalsCelnbnewCompletion o(metro <br />Orenge Line EYteesion to04tswodh Ahead ofSche�ule, <br />busway Intersects the crossing street. A bus parking lot was <br />under eUBgat <br />Owensmouth Avenue. Park-and-ride facilities were included'at <br />three stations, providing approximately 1,074 additional park> <br />Ing spaces, Design -build solutions and design creativity re- <br />duced MTA's construction estimate and saved over $61 million <br />In construction costs. <br />Emerald Say Main Gate Safety Improvements I <br />G.msroid Bay Service District Client Contact: Michael Dunbar, General Manager <br />600 Emerald Ray (949) 494-8572 <br />Laguna Beach, CA 92951 Project Dates: 2015 to 2017 <br />Willdan Is providing civil and traffic engineering de- project Team: Tyrone Peter, David Knoll, Johnny <br />sign and other appurtenant services for safety Im- Ghazal, Gary Gordon, Vanessa Muhoz, Mohson Rahim- <br />provements connected with the oommwnity's main Ian, Ross Khiaban), Ray Wellington', Michael. Bustos, <br />gate entrance. The Improvements involve widening Kenneth Krieger, RandyShadoWen, Bernardo Reyes, <br />Shamrock Road 25 feat, reconstructing the entrance $user Barrlentos, Sheila McCracken, Robert Burch, Ed - <br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan <br />Ing location; grading Shamrock Road and the adja- Moore <br />cent slope to accommodate the roadway widening and <br />desired landscaping; installing upgraded fighting; in- <br />stalling ADA -compliant curbs, ramps and retaining/mon- <br />ument walls; widening the right -turn pocket and in- <br />stalling a 175 -foot -long raised median at the intersec- <br />tion of Pacific Coast Highway and Shamrock Road; mit- <br />igating soli with 200 18 -Inch diameter drilled displace- <br />ment columns, and Installing street striping and signage <br />within Caitrana' right-of-way. The project required processing Caltrans encroachment permit and County of <br />Orangs general grading permit packages. Widening Shamrock Road provides an additional lane In each <br />IV;Proposal for On -Call Engineering: <br />Comprehensive, Innovative, Trusted. RFP No. V-083 <br />tg7. <br />�r <br />