Laserfiche WebLink
MARC FIASUNGE'R, PE <br />P.,ui,c fp iI -lr f h-ir;�1e HniI1 7011oIs <br />Having experience in both the public and private engineering sectors, Marc Haslinger brings a broad wealth <br />of experience to his jobs. He has managed and designed numerous municipal, residential, and commercial <br />projects throughout Southern California from initial planning and feasibility studies through final design, <br />construction, and construction management. His experience has included residential, commercial, and <br />industrial developments; potable and reclaimed water transmission mains and flood control facilities; <br />roadway improvements; and construction management. Haslinger is well -versed in the tools of construction <br />management, contract administration, planning, design, and processing. <br />Complementing Haslinger's project management capabilities is a hands-on approach and technical <br />knowledge of computer programs in the area of coordinate geometry, hydraulics, hydrology, structures, <br />spreadsheets, critical path networking, management, and other tools necessary for a successful project. <br />RELEVANT PROJECT EXPERIENCE <br />Western Avenue Rehabilitation — Buena Park, CA <br />Irvine Center Drive, Send Canyon to Berranco Parkway — Irvine, CA <br />Irvine Center Drive 1-405 Freeway to Lake Forest Drive — Irvine, CA <br />Bake Parkway. 1-405 to Irvine Center Drive — Irvine, CA <br />City of Dallas Facilities Capital Planning, Design and Construction - Dallas, TX* <br />Willow Avenue Brain — West Covina, CA <br />EARL TAYLOR, PE, LEER AP <br />01;!0 Csrkioerr - Huilt-7ollors <br />Carl Taylor has a strong background in public infrastructure projects. He has worked on arterial highways and <br />Intersections, local and neighborhood streets, master plan and local storm drains, city and community parks, <br />trails, streetscapes, vehicular and pedestrian bridges, city halls, libraries, community centers, memorials <br />and plazas, parking lots, sewer and water facilities, and pedestrian and bicyclelpedestrian trails. During his <br />professional career, Taylor has provided plans, specifications, estimates, and construction administration <br />and support for numerous city, county, redevelopment agency, federal, and community facilities district <br />projects. <br />RELEVANT PROJECT EXPERIENCE <br />OC Parks On -Call Projects —Orange County, CA <br />» Mathis Trail Repair, Aliso & Wood Canyons <br />» Creek Restoration, Wagon Wheel Regional Park <br />» General Development Plan, OC Zoo <br />» Santiago Creekbank Repair at Arden Modjeska <br />» Historic Site, Modjeska Canyon Nature Preserve <br />» Tijeras Creek Trail Repair, O'Neill Regional Park <br />» Trail Crossing Replacement, Santiago Oaks Regional <br />Park <br />» Wagon Wheel Creek Restorations, Thomas F Riley <br />Wilderness Park <br />» FEMA Repairs, Carbon Canyon Regional <br />Park <br />» FEMA Repairs, Limestone/ Whiting Ranch <br />Wilderness Park <br />» FEMA Repairs, Upper Newport Bay Nature <br />Preserve <br />» FEMA Repairs, Laguna Coast Wilderness <br />Park <br />»; Bakersfield National Cemetery <br />Oso Parkway & Antonio Parkway Intersection Improvements — Orange County, CA <br />Center street — Anaheim, CA <br />Townsend Place — Pasadena, CA <br />HURT- ILM City of Santa Ana Civil Engineering Services: RFP 17-083 <br />