Laserfiche WebLink
HUIT-A)UARS <br />SP'9 S®tl GU aC P RF D a, P GE <br />y g <br />GF "rrhr�i,;�i NinyC' hltiurra <br />Dr. Guha is a Principal Engineer with Ninyo & Moore with diverse professional experience in geotechnical <br />engineering design, consulting, construction, and regulatory practice. Dr, Guha coordinates and conducts1 <br />geotechnical evaluations for commercial, industrial and public facilities, including airports, bridges, <br />highways, railroads, levees, public and private buildings, various plants (e.g., water treatment, bio -refining, <br />power), pipelines, reservoirs, retaining structures, and elevated, at -grade and below -grade tanks; provides <br />guidance on various analytical and numerical procedures that are undertaken for a project including seismic <br />hazard analyses (e.g., ground motion, liquefaction, dynamic settlement, lateral spread, ground subsidence,° <br />landsliding,etc.), site-specific response spectra analyses, slope stability analyses, analyses of soil settlement,'t <br />bearing capaeityand earth pressures, assessmentof adverse effects of collapsible soil and expansivesoil, and <br />development of structural foundation, pavement sections and underground pipeline design criteria; provides <br />geotechnical design parameters and recommendations for shallow and deep foundations, temporary and <br />permanent retaining structures, slope stabilization techniques, mechanically stabilized earth (MSE) walls, <br />, <br />tieback anchors, soil nails, in-situ ground remediation and earthwork; prepares and reviews geotechnical <br />reports, proposals and transmittals; reviews laboratory test results, project plans and specifications; provides <br />! <br />supervision and technical support to project- and staff -level engineers and geologists; conducts quality <br />assurance/quality checks, and performs project administration and management. <br />RELEVANT PROJECT EXPERIENCE <br />Orange County Water District, Smith Basin - Villa Park, CA <br />Burris and Lincoln Basin - Anaheim, CA <br />Hester Basiewin Lakes Park, Proposed Pump Station and Basin Grading, Geotechnical Evaluation - <br />Garden Grove, CA <br />t <br />1-10 Replacement of the Ellis Avenue Pump Station, Orange County Sanitation District - Fountain Valley, CA <br />Reclaimed Water Reservoir for Moulton Niguel Water District - Aliso Viejo, CA <br />Effluent Pump Station Annex — lob No. 1-77, Orange County Sanitation, District Plant No. 2 - Huntington <br />Beach, CA <br />New Lateral Extension for Castaic lake Water Agency - Santa Clarita, CA <br />t <br />Chula Vista Power Plant Modernization - Chula Vista, CA <br />�9 <br />�.t <br />r,r1-;rorrrrnn;rr;ni - Er0RP <br />�) <br />Freddie Olmos has more than 20 years of experience in Enviornmenal Engineering and is proficient with <br />environmental undertaking of the design of streets, basins, sewer, water, storm drain, grading, and public <br />works projects, <br />RELEVANT PROJECT EXPERIENCE <br />t <br />West Street and Citron Street Sidewalk Gap Closure Project - Anaheim, CA <br />Lincoln Avenue Widening Project - Anaheim, CA <br />La Palma Avenue at East Street Sidewalk Cap Closure Project - Anaheim, CA <br />State College Boulevard and La Palma Avenue Intersection Improvement Project - Anaheim, CA <br />City of Santa Ana Civil Engineering Services: RFP 17-083 <br />