HUIT-A)UARS
<br />SP'9 S®tl GU aC P RF D a, P GE
<br />y g
<br />GF "rrhr�i,;�i NinyC' hltiurra
<br />Dr. Guha is a Principal Engineer with Ninyo & Moore with diverse professional experience in geotechnical
<br />engineering design, consulting, construction, and regulatory practice. Dr, Guha coordinates and conducts1
<br />geotechnical evaluations for commercial, industrial and public facilities, including airports, bridges,
<br />highways, railroads, levees, public and private buildings, various plants (e.g., water treatment, bio -refining,
<br />power), pipelines, reservoirs, retaining structures, and elevated, at -grade and below -grade tanks; provides
<br />guidance on various analytical and numerical procedures that are undertaken for a project including seismic
<br />hazard analyses (e.g., ground motion, liquefaction, dynamic settlement, lateral spread, ground subsidence,°
<br />landsliding,etc.), site-specific response spectra analyses, slope stability analyses, analyses of soil settlement,'t
<br />bearing capaeityand earth pressures, assessmentof adverse effects of collapsible soil and expansivesoil, and
<br />development of structural foundation, pavement sections and underground pipeline design criteria; provides
<br />geotechnical design parameters and recommendations for shallow and deep foundations, temporary and
<br />permanent retaining structures, slope stabilization techniques, mechanically stabilized earth (MSE) walls,
<br />,
<br />tieback anchors, soil nails, in-situ ground remediation and earthwork; prepares and reviews geotechnical
<br />reports, proposals and transmittals; reviews laboratory test results, project plans and specifications; provides
<br />!
<br />supervision and technical support to project- and staff -level engineers and geologists; conducts quality
<br />assurance/quality checks, and performs project administration and management.
<br />RELEVANT PROJECT EXPERIENCE
<br />Orange County Water District, Smith Basin - Villa Park, CA
<br />Burris and Lincoln Basin - Anaheim, CA
<br />Hester Basiewin Lakes Park, Proposed Pump Station and Basin Grading, Geotechnical Evaluation -
<br />Garden Grove, CA
<br />t
<br />1-10 Replacement of the Ellis Avenue Pump Station, Orange County Sanitation District - Fountain Valley, CA
<br />Reclaimed Water Reservoir for Moulton Niguel Water District - Aliso Viejo, CA
<br />Effluent Pump Station Annex — lob No. 1-77, Orange County Sanitation, District Plant No. 2 - Huntington
<br />Beach, CA
<br />New Lateral Extension for Castaic lake Water Agency - Santa Clarita, CA
<br />t
<br />Chula Vista Power Plant Modernization - Chula Vista, CA
<br />�9
<br />�.t
<br />r,r1-;rorrrrnn;rr;ni - Er0RP
<br />�)
<br />Freddie Olmos has more than 20 years of experience in Enviornmenal Engineering and is proficient with
<br />environmental undertaking of the design of streets, basins, sewer, water, storm drain, grading, and public
<br />works projects,
<br />RELEVANT PROJECT EXPERIENCE
<br />t
<br />West Street and Citron Street Sidewalk Gap Closure Project - Anaheim, CA
<br />Lincoln Avenue Widening Project - Anaheim, CA
<br />La Palma Avenue at East Street Sidewalk Cap Closure Project - Anaheim, CA
<br />State College Boulevard and La Palma Avenue Intersection Improvement Project - Anaheim, CA
<br />City of Santa Ana Civil Engineering Services: RFP 17-083
<br />
|