Laserfiche WebLink
CSG PROPOSAL TO SANTA ANA <br />MILE ONE PROJECT <br />r <br />March 20, 2018 p <br />Armando Fernandez <br />Project Manager <br />City of Santa Ana <br />Public Works Department <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />Rec RFP No. 17-088 genera) Engineering other than Water Resources — option 8 (Mlle One project) <br />CSG Consultants, Inc. (CSGj Is pleased to present our proposal to provide engineering services for Mile One <br />Street Project. Our proposed team has an assortment Of project management skills and relevant experience <br />in roadway assessment & design, complete street, pavement management, Caltrans local assistance, traffic <br />signal design, lxtkeway design, public outreach, and federal grant admtnistration. CSG has provided similar <br />services for Many municipalities throughout California, We have developed a great understanding for the <br />municipalities' needs and expectations, and have e. 9perlcnce collaborating with Citles' staff to ensure <br />successful delivery of the project. <br />Peykan Abbassi, PE, Principal Engineer, will serve as the Principal in Chaege and project Manager for this <br />contract, <br />Peykan Abbassi, PC, I project Malrager <br />3.707 W. Garden Grove blvd., Suite 100 ( Orange, CA 92868 <br />phone (714) 568-101011 peykana@@csgangr,com <br />Mr, Abbassi brings over 32 years of engineering. management experience for public works projects in both <br />municlpal government and transit; Agencies. Mr..Abbassi p,revouslyserved;as the project MMnagar/lead <br />Engineer representing the City of Eos Angeles for EXPO G (construction phase), and Regional Connector <br />(preliminary design phose). Tna work included establishing comm protocols and procedures to <br />respond proactively during Inherently fast -paced design -build project developmant and construction. Having <br />performed project Management tasks similae to the requlremants for the City's project has provided Mr. <br />Abbassi with the hands-on experience and knowledge required to deliver a successful project. He has <br />managed design and construction of many Infrastructure projects for the City of Los Angeles, City of Half <br />Moon Bay and North County Transit District. <br />CSG has teamed with Geo-Advantec, Wagner Engineering & Survey(WES), Summers/Murphy & <br />Portners(SMP), and Transpo Group. Geo-Advantec \4111 assist the team with all soil and pavement:related <br />testing and reports, Wagner Engineering will provide surveying services, SMP Inc. will perform landscape <br />architecture, and Transpo Group will assist the project with all required traffic studies, <br />We are excited about the opportunity to serve the City of Santa Ana and would welcome the opportunity to <br />talk with you further, As President, I am empowered to negotiate the contract an behalf of our firm. If you <br />have any questions or need additional information, please contact Mr. Abbossl at peykana@csgengr.com or <br />(714) 5684010. <br />Sincerely <br />�f <br />Cyrus <br />president, CSG Consultants, Inc, <br />3707 West Garden Grove Blvd, #100, Orange, CA 92868 <br />phone (714) 568.1010 1 fox (714) 568-1028 1 www.csgengr,com <br />APON <br />CSG <br />OON$ULTANra <br />