Laserfiche WebLink
CSG PROPOSALTO SANTA ANA <br />Mae ONE PROJECT <br />Avenue, Design work Included the installation of class III bikeways with shared -lane markings, or "sharrows" <br />and appropriate signage; bicycle loop detactoes and pull boxes, camera systems at Intersections on existing <br />signal mast arms with new conduits, and pedestrian push buttons post, and foundation. Additional scope of <br />workincluded upgrades existing nomADA compliant ramps to ADA compliance, concrete Improvement.$; <br />Including sidewalk, curb and gutter,ondvolley gutter replacement, drainage iniet modifications, monument <br />adjustment, and electrical pull boxes adjustments to finished grade. <br />STREET RECONSTRUCTION AT VARIOUS LOCATIONS I CITY OF SAN MATEO, CA <br />The City of San Mateo selected CSG as thelydesign consultants for street reconstruction at various locations. <br />The scope of work Included mobilization; traffic tontrol; ,sign relocations; tonvote improvements, include <br />installation of ADA curb ramps, .sldewalks, curb &s,gutter and driveways. Concrete road pavement Yemovals <br />and replacements; asphalt concrete grinding; asphalt concrete deeplift dlgout repairs; roadway reflective <br />cracking mitigatioh via. crack sealing, subgrade enhancement geotewtite, hot mix asphalt paving; utility <br />adjustments to grade;:catch basin, RCP and H&E storm drain pipe installation., tree removal; pavement <br />striping, markings, and markers; and other related work, Work also Included the preparation of Caltrans. <br />encroachment permit. <br />VARIOUS STREETS AND ROADS PAVEMENT PROJECT I CITY OF MILLBRAE, CA <br />CSG was selected by the City to perform the des <br />Ignof pavement. <br />rehabilitation for a major City a, rterial, Millbrae Avenue, and a <br />residential street,: Magnolia Avenue. The project Included pavement <br />coring sample testing, surveying, pavement rocommendations <br />report, traffic handling plans, ADA curb ramp upgrades, traffic signal <br />repair and traffic detours. Stakeholder coordination was reg wired <br />with Caltrans Local Assistance far compliance with Federal funding <br />guidelines (un E•76 was obtained €or thlSproject), as well as Caltrens <br />Encroachment Permit Department for coordination with Caltrans <br />design review staff regarding Caltrans owned facilities, <br />2056-17 STREET RESURFACING PROJECT I CITY .OF STOCKTON, CA <br />Miner Avenue, Arch Airport Road, Pershing Avenue and March Lane are arterlals and collectors which exhibit <br />.alligator cracking, block tracking, longltudinal/transverse cracking, patching and utility cats, rutting,. <br />depressions, spatting and some progressed to base failures, in order to receive a Federal RegionalSurface <br />Transportation Program Fund for Fiscal year 2016.17, City selected.CSG to perform preliminary and final <br />design of pavement rehabilitation, and prepare a PS&€ bid package In an aggressive design schedule. The <br />scope of the project included performing initial visual assessment of pavement conditions, conducting <br />pavement section Investigations including coring and deflection testing, selectingand recommending the <br />most appropriate pavement treatments with consideration of costs, construction duration and potential <br />impacts to the public, performing life cycle cost analysis for each selected pavement treatment alternative, <br />developing a pavement recommendation report with preferred treatments identified for each roadway, <br />locating existing survey monuments and right -of woy, assisting the City to file corner records atter alterations <br />to the survey monuments, requesting utility maps from Stockton's Municipal Utility District, Cal Water <br />Services Company, PG&E, AT&T and Comcast and coordinating with these utility companies for adjustments <br />to their facilities, and preparing layout, traffic handling and detour plans, construction cost estimate and <br />specifications, The types of recommended pavement rehabilitation treatments Included hot mix asphalt mill <br />and flit replacements, pavement base failure repairs (digouts), mlcrosurfacing, pavement patch and leveling, <br />and crack sealing. <br />