My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSG
Clerk
>
Contracts / Agreements
>
C
>
CSG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:03:37 AM
Creation date
7/20/2018 12:19:15 PM
Metadata
Fields
Template:
Contracts
Company Name
CSG
Contract #
A-2018-159-03
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
12/4/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CsG PROPOSAL TO SANTA ANA <br />MILE ONE PROJECT' <br />copeofServices & ScheduleSECiI'BN <br />COMPLETE STREET <br />CSG has completed Complete street engineering design for several agencies. These projects provide <br />accommodations for pedestrians, bicyclists, vehicles, and public transportation in asofe and efficient <br />manner. The selection of appropriate surface matarlals must cater to the primary user(s), identifying <br />optimised dimensions based on right of way restrictions, budget, and multl-usebtlity can dictate the design's <br />grading, edge treatments, vertical clearances; and clearing and grubbing requirements, For VADA compliance <br />the design will meat all reOlvOrnentS for taneltudlnal and cross slopes, width and height clearances, and the <br />use of detectable warning surfaces at vehicularcrossjngs. Our approach to drainage design Includes analysis <br />of the drainage pattern and modifying the grading oa deeded, implementation of catch basins and buried <br />pipe networks to connect to existing storm drain systems;. CSG comprehensive design Includes all necessary <br />slgi age, striping, lighting, and/oe landscaping. Providing usable and safe paths and/or trails for communities <br />is an Important part of CSG s services, <br />Street Improvements <br />CSCa staff Includes complete streets and active. transportation prroject <br />design. ers with extensive e)Gperience on class 1, 2, g and even the new <br />Blass 4 blcyde facilities. Some key project components include: <br />• Right of way <br />• Funding ftedeml vs. local) <br />• Materials <br />Shared use facilities <br />• Traffic Signal Integration <br />• $ignoge and chanmelization <br />• Separation (buffer) from vehicles (both high speed vehicles, <br />and parked vehicles can present hazards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DESIGN OVERVIEW AND APPROACH <br />CSG has a thorough understanding of the various steps that are involved in delivering a successful bikeway <br />and streetscape project, as outlined in the table below: <br />CSG will work with City staff to deliver a successful, construction -ready project, Project <br />management and design development efforts will include the following: <br />1. General,project • Field Investigation <br />Management and ° Finalize design concept <br />Design Project Meetings <br />• preparation of reports and recommendations <br />Development , Preparation of plans, specifications, and estimates (PS&C) <br />• <br />Manage project schedule and budget <br />+ Bidding/construction support <br />2. pavement Our staff Is experienced in a variety of street rehabilitation strategies, and will review the <br />following options for opplicabNityon the Mlle One project: <br />
The URL can be used to link to this page
Your browser does not support the video tag.