Laserfiche WebLink
CsG PROPOSAL TO SANTA ANA <br />MILE ONE PROJECT' <br />copeofServices & ScheduleSECiI'BN <br />COMPLETE STREET <br />CSG has completed Complete street engineering design for several agencies. These projects provide <br />accommodations for pedestrians, bicyclists, vehicles, and public transportation in asofe and efficient <br />manner. The selection of appropriate surface matarlals must cater to the primary user(s), identifying <br />optimised dimensions based on right of way restrictions, budget, and multl-usebtlity can dictate the design's <br />grading, edge treatments, vertical clearances; and clearing and grubbing requirements, For VADA compliance <br />the design will meat all reOlvOrnentS for taneltudlnal and cross slopes, width and height clearances, and the <br />use of detectable warning surfaces at vehicularcrossjngs. Our approach to drainage design Includes analysis <br />of the drainage pattern and modifying the grading oa deeded, implementation of catch basins and buried <br />pipe networks to connect to existing storm drain systems;. CSG comprehensive design Includes all necessary <br />slgi age, striping, lighting, and/oe landscaping. Providing usable and safe paths and/or trails for communities <br />is an Important part of CSG s services, <br />Street Improvements <br />CSCa staff Includes complete streets and active. transportation prroject <br />design. ers with extensive e)Gperience on class 1, 2, g and even the new <br />Blass 4 blcyde facilities. Some key project components include: <br />• Right of way <br />• Funding ftedeml vs. local) <br />• Materials <br />Shared use facilities <br />• Traffic Signal Integration <br />• $ignoge and chanmelization <br />• Separation (buffer) from vehicles (both high speed vehicles, <br />and parked vehicles can present hazards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DESIGN OVERVIEW AND APPROACH <br />CSG has a thorough understanding of the various steps that are involved in delivering a successful bikeway <br />and streetscape project, as outlined in the table below: <br />CSG will work with City staff to deliver a successful, construction -ready project, Project <br />management and design development efforts will include the following: <br />1. General,project • Field Investigation <br />Management and ° Finalize design concept <br />Design Project Meetings <br />• preparation of reports and recommendations <br />Development , Preparation of plans, specifications, and estimates (PS&C) <br />• <br />Manage project schedule and budget <br />+ Bidding/construction support <br />2. pavement Our staff Is experienced in a variety of street rehabilitation strategies, and will review the <br />following options for opplicabNityon the Mlle One project: <br />