Laserfiche WebLink
CSG PROPQSAL'TO SANTA ANA <br />Mie ONE PROJMI <br />Rehabilitation • Crack sealing and repair • Rubberized HMA (RHMA) <br />• Base repair patch djgauts overlay <br />• Cape, chip, scrub, fog &, slurry seals • Pavement fabric <br />• Mlefosurfacing • Mill and f lJs <br />• Rubberized chip seals • Coldin•piace recycling (CIR) <br />• Hat mix asphalt (HMA) overlay • Full depth <br />recycling/rehabilitation (FOR) <br />• Street reconstruction <br />Traffic signal modifications will barnacle to accommodate bicycle detection, and wijl <br />Include the following; <br />a, signal'upgra.das for a Upgrades to existing traffic signal poles • Video detection for bicyclists, <br />Bicycle Attivotiari . New traffic signal poles, If needed and vehicles <br />• Removal of exisFlrig(ndottlon <br />loops; as needed <br />Our staff is experienced providing project delivery of federally funded projects, and will <br />assist the City h) developing and submitting the following to the CaltransLocal. Assistance <br />Divisiom <br />A, Federal Aid . Project Field Review (LAPM forms) <br />Requirements + NERA/CMA Environmental Clearance. <br />• Riglrt of Way Certification <br />• UtilityCertlflcatloh <br />• E76 Request for Authorization to Proceed with Construction <br />CSG staff are knowledgeable in bikeway and streetscape deslgn, and take fate <br />S. Blkewayand account considerations of all users, including motorists, pedestrians,bicydlsts;,and <br />Straetscapa Design transit users. CSG will draw upon puhhshad blkeniny deslgn resources such as the <br />AASHTo ,�uidefortheDevelopmentofBlurycleFacilitias',the:NAACTODesign <br />Guide, the California MUTCO, and FHWAand Caltrans Guidance, <br />CSG will design AOA upgrades at intersections when triggered by pavement resurfacing <br />6. ADA Upgrades beyond normal maintenance (e.g. grind and inlay): <br />e Curb Ramps • Crosswalks <br />• Island Passageways <br />CSG will Work wfth the City to provide outreach to project stakeholders. <br />• Preparing exhibits for public meetings <br />7. Stakeholder • Leading public meetings to discuss proposed improvements <br />Involvement}PublIe • Attendance at Bicycle tend Pedestrian Advisory Committee and City Council Meetings <br />Outreach • Notificatfonspriorte construction <br />• Providing access .durini;constriiWon <br />• LIMIted.disruption duration <br />Design Approach Checklist <br />CSG has identified a check list for our general design approach for Individual roadway design projects shown <br />below. We make sure to address all of these items with the agencies we work with to ensure a well managed <br />and designed project. <br />10 Design'kok off meeting with the City, and record and distribute minutes <br />0 Identify permits required and prepare documentation <br />[RI Right of way research and mapping <br />M Coordination with affected property owners <br />M Pavement investigations and reporting <br />o Coring and deflection testing (optional Scope AddltlWn) <br />o Develop Pavement Design Memo providing rehabllitation alternatives and a preferred <br />treatments for design <br />