My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CSG
Clerk
>
Contracts / Agreements
>
C
>
CSG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:03:37 AM
Creation date
7/20/2018 12:19:15 PM
Metadata
Fields
Template:
Contracts
Company Name
CSG
Contract #
A-2018-159-03
Agency
Public Works
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
12/4/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSG PNOROSAL ro SANTA ANA <br />MILE ONE PROIEC7 <br />Quality Assurance/Quality Control (QA/QC) <br />C$G's in-house QA/QC program utilizes a peer review process with multl,level Internal project checking. As <br />highlighted in the organizational chart forthis on-call contract we have Identified: highly qualified individuals, <br />each with over 90 years of experience, ensuring that each submittal and task delivery Is In conformance with <br />the City of Santa Ana and CSFs high standards of quality, Michael Fisher, PE,.QSD/P will manageand <br />coordinate ail QA/QC activities. Mr, Fisher will be responsible for the following; <br />• Establishing guidelines a assigning accountabie personnel and responsibilities for each task, <br />• Assuring that all deliverables are reviewed, including products from subconsuitants, <br />• Monitoring the process to assure that the schedule and budget are followed. <br />• Particlpatingin the internal and external reviews. <br />• Reviewing and signing off on dellverables.beforo submittal to the City. <br />All technical products, including technical engineering reports, studies; design notes, mapping, drawings, and <br />engineering cost estimates are subject to a moltlAlered approach for review to ensure that all products are <br />checked foraocuracy, <br />correctness, <br />completeness and L <br />UM 6 <br />conformity with <br />standards, The tiers Z reUoifhawMkp bac .wcnd erk,edo4'mp.nw I'. <br />will Include routine - <br />checking and <br />scheduled reviews for <br />the internal phase,, <br />and external reviewst <br />by the City and other <br />affected agencies. The <br />Protect Manager will <br />conduct periodic <br />audits of the QA/QC l ,,�.",fir` ,; . <br />review process to <br />ensure that reviews <br />are being properly <br />Conducted and documented by All team members, Each task we are selected for will receive formai QA/QC <br />review at the various submittals, and reports will receive reviews at the draft and pre•final submittal stages <br />beilverables will be reviewed for; <br />• conformance to approved formats„ criteria, specifications & professional standards of practice. <br />• Adequacy, clarity, ease of Interpretation <br />• Cbnstructability <br />• Compatibility of design discipline Interfaces <br />• Errors and discrepancies <br />• Coordination With related designs and project elements <br />• Integration of design disciplines <br />• incorporation of design changes <br />• conformance to required environmental mitigation <br />Review comments by QC reviewers will be in writing, Comments may also he placed in the documents being <br />reviewed, but all comments for which a response is desired will be transcribed Onto the comment forms, A <br />log to record QC measures taken during the course of the protect, Including corrective actions taken, will be <br />maintained by the Protect Manager. <br />
The URL can be used to link to this page
Your browser does not support the video tag.