CSO PROPOSAL TO SANTA ANA <br />MILE ONE PROJECT <br />4. Review and approval of sample and material submittals specified in Contract Documents which <br />Import the design. <br />5, Review of any proposed substitutions for conformance to the Contract Documents. <br />6, Responding to Construction Change Orders (CCOs) and review of Requests for quotations, If needed. <br />7. Preparation of Record Drawings based on redlines provided by the Contractor and field reviews, <br />our staff Is highly responsive to requests received during construction, and understands that timely are <br />crucial In avoiding construction delays and claims. <br />CSG has assumed that the following construction related meetings will be required, as outlined in the RPP; <br />4. Internal Handoff Meeting between Design and Construction Team (CSG to lead this meeting) <br />5. Pre -Construction Meeting <br />6. Three (8) Construction Progress Meetings <br />7. Pre -Final Wail<Through <br />8, Final Wail(Through <br />8. "Lessons Learned Meeting", atthe end of the project <br />Additional construction support may be provided as additional scope. <br />Task Deliverables; <br />Meeting Agenda for Internal HandofjMeeting <br />• Record Drawings In AutoCAD and PDF Format <br />