Michael
<br />Fisher CSG
<br />PE,OSD/P
<br />Principal Engineer OONSULTANTS
<br />LICENSES and
<br />Mr, fisher Is a CIAI engineer with over 25 years of experience In civil/roadway design,
<br />CERTIFICATIONS
<br />drainage design, trafficanglneerlog, specification writing, engineering report writing and
<br />PrOfaaioreal UAI Enginoer
<br />project management. He has managed teams of engineers, working to deliver over a
<br />State of 611hllia
<br />dozen projects ranging in size from $20;000 to $22,000,000 with project status ranging
<br />c3bSIG
<br />from project inial lon/feasibility/study phase to approval/environmental phase tto final
<br />Qualified SWPPP Devaloperlpratitioner
<br />design and construction. Mr. Fisherhas extensive experience working on roadway design,
<br />J U564
<br />Including intersection and median projects. His design work Includes horizontal and
<br />vertical gpometric layout, rltilpty coordination, traffic signal design, signing and striping
<br />EDUCATION
<br />design and drainage design.. His projects have incorporated current LID design practices
<br />Bachelor of Schnee, tiyil Ingkiekring,
<br />including biofiltration, Infiltration,:and detention basins,
<br />San Jose State Dnive, CA A
<br />jSwi JoaeG
<br />RELEVANT EXPERIENCE
<br />PROFESSIONAL
<br />Sunnyvale Pavement Rehabilitation20171City of Sunnyvale, CA
<br />AFFILIATIONS
<br />Mr. Fisher served asthe project Manager for this Annual streatPavement rehabilitation
<br />South Bay Transportation Offices Association
<br />project. The scope Involved the rehabilitation of 2 streets In the City of Sunnyvale, Work
<br />iSBTOAj, fast President
<br />included the design ofgri7id and HMA overlay, digouts; utility adjustments, curb romps,
<br />Toatauascera lstarnaaionai
<br />concrete sidewalk, curb, gutter and driveway replacement, and striping plans,
<br />cia; asifluin
<br />Fairoaks Btkawayandstreetscape I City Of Sunnyvale, CA
<br />Mr, Fisher;served as the Project Manager for the design of Glass 2 Bicycle tanes.on Fair
<br />Oaks Avetnue between Old Son Francisco (toad to Evelyn Road, Kifer Avenue to Arques
<br />Avenue, and Wolfe Road to Ahwonee Avenue. Key project elements included
<br />reconfiguring the roadway, roadway resurfacing, addition of green bike.lanes,
<br />modifications to the existing concrete median islands, modification of:parking, and
<br />Installatian of related signage. Mr. Fisher led public outreach meetings to keep the
<br />residents informed of the project.
<br />First Streetand City Alloy Resurfacing Project I City of Los Altos, CA
<br />Mr. Fisher served as the project Manager for these two resurfacingprojects, which
<br />Involve rehabilitation of 20 City alleyways as well as First Street between West Edith
<br />Avenue and State street, He oversaw preparation of the project PS&E.paekage, Basis of
<br />Design Report, and coordinated with utility owners for adjustments of their facilities.
<br />JuniperoSerra atKing Boulevard lntersectlonlorprovernontsICIty of south san
<br />Francisco, CA
<br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic
<br />signal upgrade project. The project goal was to improve mobility for all modes, and brings
<br />the intersection up to current standards for bicyclists, pedestrians, and ADA access.
<br />Project Included preliminary design, community outreach, agency coordination including
<br />Caltrans. The project scope included redesign of the existing medians and right -turn
<br />islands to improve Intersection geometry and provide ADA compliance, replacement of
<br />the existing traffic signals located in the median with mast arm signals to Improve
<br />visibility, addition of a speed feedback sign on southbound Junipero Serra, and extension
<br />of existing bike lanes along Junipero Serra Boulevard through the King Drive intersection
<br />to improve bicycle safety.
<br />W, Edith and University Crosswalkimprovements I C I t y of Los Altos, CA
<br />Mr. fisher served as the Project Manager for the design of traffic calming elements to
<br />allow for safe visible crossing of Edith Avenue, The design also Included the installation of
<br />crosswalk signs and in -ground warning lights.
<br />
|