Laserfiche WebLink
Fair Oaks Bikeway and Streetscape(City of Sunnyvale, CA <br />Me, Seto served as the Project Engineorfor this project The scope involved the <br />Installation of Class III green bicycle markings and bicycle detector markings along with <br />various intersection improvements, Work Included the detailed grading design of several <br />curb returns to meet ADA requirements, restriping of various intersections and <br />replacement of concrete sidewalk; curb and gutter. <br />2017PavamentRehabliitationProject ICity of Sunnyvale, CA <br />Mr. Seto served as the Project Engineer for this annual streetpavement rehabilitation <br />project, The scope Involved the rehabilItation of 2 streets In the City of Sunnyvale, Work <br />included the design of grind and HMA overlay,. digouts, utility adjustments, curb ramps, <br />congrete sidewalk, curb, gutter and driveway replacement, and striping plans. <br />2016 Street Reconstruction at Various Locations) City of San Mateo, CA. <br />Me, Seto served as the Design Engineer for street Improvements at various locations <br />throughout San Mateo. The project involved concrete road pavement removals and <br />replacements of various streets, installation of ADA curb ramps, sidewalks, curb & gutter, <br />and driveways, Also included were utility adjustments to grade, Installation of catch <br />basins, RCP and HDPE storm drain pipe installation, pavement striping, markings, and <br />markers; and other related work. He also managed the preparation of Caltrans <br />encroachment permit. <br />Mary Avenue Bike Lane ( City of Sunnyvale, CA <br />Mr, Seto served as CS6's design engineer for this project: The scope Involved installing a <br />class II bike lane on both sides of Mary Ave from Fremont Ave to Maude Avenue (3 miles). <br />Civil scope of work Includes concrete improvements, asphalt concrete dlgout repairs, <br />crack sealing, slurry seal, utitity adjustments and other related work. <br />Measure.1 and I, & Annual Pavement Rehabilitation 20151 City of Orinda, CA <br />This Measure J & L project rehabilitated local/residential roads with a PCI value less than <br />25, The scope included Identifying various depths of full depth rehabilitation to <br />rehabilitate 23 local roads and two collector roads, As Project Engineer, Mr. Seto was <br />responsible for the field assessments, utility company coordination, and development of <br />PS&E documents. He also assisted In the preparation of addendurns and bud support, <br />CSGDavid Seto <br />PE oosvauLTAnrra <br />Senior Engineer <br />LICENSES and <br />Mr. Seto is a Senior Engineer with over 12 years of experience in the transportation field. <br />CERTIFICATIONS <br />Me, Sato has been a project engineer for muitiple transportation projects and was <br />Proftsiloul Engineer <br />responsible for the preparation of pians, specifications, and estimates for traffic signals, <br />hate of (Afomia <br />j 178138 <br />lighting, traffic operation system, ramp metering, streetsupe Improvements, roadway <br />intersection, grade separations, and stage construction projects, He is knowledgeable of <br />EDUCATION <br />and has prepared designs to Caltrans, Counties, and Cities standards, He is proficient in <br />Wielor of ldenta; buil logioong <br />the use of MicroStatfon and AutoCad Civil 31). <br />8nivenityoffalifomia®avls <br />RELEVANT EXPERIENCE <br />Davis, a <br />Beach and Reservation Road Roundabouts ( City of Marina,, CA <br />PROPIESSIONAL <br />Mr. Seto was the Project Engineer for this roundabout project for the City of Marine, The <br />WILIATiONS <br />project created two roundabouts, atone of the city's main entrances adjacent to a <br />Mariwn Punic Warks ksodmion (AfWA) <br />freeway interchange. The project helped create a gateway entry statement to one of the <br />taasmrastars Intonational <br />City's main commercial corridors. The scope also included decorative lighting, bicycle and <br />Seoot,aq <br />pedestrian safety improvements, and landscaping improvements to creates an attractive <br />41u4: 4840471 <br />entry to the city, <br />Fair Oaks Bikeway and Streetscape(City of Sunnyvale, CA <br />Me, Seto served as the Project Engineorfor this project The scope involved the <br />Installation of Class III green bicycle markings and bicycle detector markings along with <br />various intersection improvements, Work Included the detailed grading design of several <br />curb returns to meet ADA requirements, restriping of various intersections and <br />replacement of concrete sidewalk; curb and gutter. <br />2017PavamentRehabliitationProject ICity of Sunnyvale, CA <br />Mr. Seto served as the Project Engineer for this annual streetpavement rehabilitation <br />project, The scope Involved the rehabilItation of 2 streets In the City of Sunnyvale, Work <br />included the design of grind and HMA overlay,. digouts, utility adjustments, curb ramps, <br />congrete sidewalk, curb, gutter and driveway replacement, and striping plans. <br />2016 Street Reconstruction at Various Locations) City of San Mateo, CA. <br />Me, Seto served as the Design Engineer for street Improvements at various locations <br />throughout San Mateo. The project involved concrete road pavement removals and <br />replacements of various streets, installation of ADA curb ramps, sidewalks, curb & gutter, <br />and driveways, Also included were utility adjustments to grade, Installation of catch <br />basins, RCP and HDPE storm drain pipe installation, pavement striping, markings, and <br />markers; and other related work. He also managed the preparation of Caltrans <br />encroachment permit. <br />Mary Avenue Bike Lane ( City of Sunnyvale, CA <br />Mr, Seto served as CS6's design engineer for this project: The scope Involved installing a <br />class II bike lane on both sides of Mary Ave from Fremont Ave to Maude Avenue (3 miles). <br />Civil scope of work Includes concrete improvements, asphalt concrete dlgout repairs, <br />crack sealing, slurry seal, utitity adjustments and other related work. <br />Measure.1 and I, & Annual Pavement Rehabilitation 20151 City of Orinda, CA <br />This Measure J & L project rehabilitated local/residential roads with a PCI value less than <br />25, The scope included Identifying various depths of full depth rehabilitation to <br />rehabilitate 23 local roads and two collector roads, As Project Engineer, Mr. Seto was <br />responsible for the field assessments, utility company coordination, and development of <br />PS&E documents. He also assisted In the preparation of addendurns and bud support, <br />