Laserfiche WebLink
WAGNER <br />ENGINEERING <br />CIVIL ENGINEERS • SURVEYORS • RIGHT-OF-WAYS SHE • WBE , OBE . CERTIFIED <br />Stephanie A. Wagner, PE, PLS, LEER®AP, FACEC <br />Areas of Expertise <br />Principal Surveyor iEngineer <br />• Civil rEngiheering <br />• Survey & Mapping <br />Ms, Wegner is a well-known leader In the civil engineering and land surveying <br />• Right -of -Way Engineering <br />professions. Site Is the dedicated founder of her tlma,end has Managed civil design and <br />construction surveys for LAUSD, CALTRANS, Metro, Alameda Corridor East, City and <br />Years of Experience <br />County of Los Angeles and numerous other municipalities. She has a divorse project <br />• WES, 261 Other 15 Years <br />and task management background with over 36 years of experience, She has led 0, civil <br />Education <br />des(gn.team for 26 years with Wagner Engineering & Survey, Inc. (WES) and stresses <br />• 1974 BS Civil Engineering, <br />sustainable design for all projects: Her knowledge In mapping and field survey formats, <br />Nicholls State University, LA <br />boundary establishments, datum compatibility, design and oonstructlon methods Is an <br />o Graduate Courses, Tulans <br />invaluable asset. <br />and LSU <br />Registration/Certification <br />Project Specific Experience <br />1990 Registered Civil <br />Los Angeles County Six Public Parks, Low Angeles, CA <br />Engineer CA 046979 <br />Ms. Wagner managed and suporvised the laid surveying, mapping and civil designfor <br />• 1982 PE In Civil Engineering <br />six parks throughout the county. All mapping and contours were CARD generated. Ms. <br />LA420270 <br />Wagner supervised grading; hydrology and ADA -compliant construction plans, Cost <br />. 1067 Licensed Land <br />estimates were generated end assistance was given to contractors in the bidding <br />Surveyor CA 95752 <br />process. <br />1989 Lifetime Instructor <br />Credential, Engineering, CA <br />Metria Northern Canoga Extension of the Change Line EIR & PE, San Fernando <br />Community College System <br />Valley, CA <br />+ 2004 LEEDe Accredited <br />Ms. Wagner supervised the survey and rlght-cf way portionof the project, which <br />Professional <br />Included a 4 -mile, bike, path, She managed the photogrammetric field surveying, aerial <br />Professional societies/ <br />Profess; <br />mapping and right-of-way engineering for the 4rmile northern extension of existing <br />Affi• <br />Orange Line from the Canoga Station to the Chatsworth Metroiink.9tation. The mapping <br />1998 LA Chapter President, <br />& digital terrain models (tOTM's) Were delivered to the Metro certified to exceed National <br />1993 -Presort, Board <br />Mapping Accuracy Standards, Ms. Wegner supervised the 10 topographic; station <br />Member a sent, Director <br />surveys along the route and the legal descriptions and plate of the design-identifled <br />American Council of <br />acquisition areas, <br />Engineering Companies <br />(ACEC) <br />San Fernando Class 9 Bikeway, Burbank CA <br />a US Careen Building Council <br />Ms. Wagner managed the field survey and right-of-way enginooring effort for the <br />Preliminary Engineering phase of this proposed bike path. She supervised the <br />a CA Land Surveyors <br />production of theprellminary rlghtof--way map which was mathematically compiled from <br />Association (CLSA) <br />detailed roaaarch of existing records Including documents and maps from the City of <br />a ACEC, Trustee, Business <br />Burbank, UP/MTA/SCRRA railroad Right -of -Way, County Flood Control Right -of -Way, <br />Insurance Trust <br />and private parcels determined from the County of Los Angeles Assessor Maps, <br />Awards <br />recorded Tract and Parcel Maps and Records of Survey and Corner records. <br />0 1996 National Association of <br />Women Business Owners <br />County of Loa Angeles Hollywood Bowl RenevationfExpanslon <br />(NAWBO) Woman of the <br />Project, Los Angeles, CA <br />Year in Construction <br />Me, Wagner as the Civil Project Manager provided the civil engineering design <br />• 2005 & 2011 ACEC Member <br />services for the construction of the three additional escalators at the Hollywood Bowl, <br />Firm of the Year <br />She also oversaw the field survey and topographic survey mapping tasks that were <br />. 2019 ACEC Engineering <br />performed for the elevator designs, The WES team also provided construction staking, <br />Excelience Award Metre 1- <br />710 Corridor Project <br />City of Santa Monies Ishihara (Buffer) Park <br />. 2014 ACEC Engineering <br />Ms, Wagner managed the construction surveying services for this new park bulif <br />Excellence Award LABOE <br />between Stewart Street and Dorchester Avenue In Santa Monica. Eight unique mom - <br />White Paint Landslide Project <br />like garden spaces were created. WES established a control network, located utilities, <br />• 2015 Fellow - ACEC <br />perfomaod rough grade and fine grade pavement surveys under the supervision of Ms, <br />Wagner, <br />