WAGNER
<br />ENGINEERING
<br />CIVIL ENGINEERS • SURVEYORS • RIGHT-OF-WAYS SHE • WBE , OBE . CERTIFIED
<br />Stephanie A. Wagner, PE, PLS, LEER®AP, FACEC
<br />Areas of Expertise
<br />Principal Surveyor iEngineer
<br />• Civil rEngiheering
<br />• Survey & Mapping
<br />Ms, Wegner is a well-known leader In the civil engineering and land surveying
<br />• Right -of -Way Engineering
<br />professions. Site Is the dedicated founder of her tlma,end has Managed civil design and
<br />construction surveys for LAUSD, CALTRANS, Metro, Alameda Corridor East, City and
<br />Years of Experience
<br />County of Los Angeles and numerous other municipalities. She has a divorse project
<br />• WES, 261 Other 15 Years
<br />and task management background with over 36 years of experience, She has led 0, civil
<br />Education
<br />des(gn.team for 26 years with Wagner Engineering & Survey, Inc. (WES) and stresses
<br />• 1974 BS Civil Engineering,
<br />sustainable design for all projects: Her knowledge In mapping and field survey formats,
<br />Nicholls State University, LA
<br />boundary establishments, datum compatibility, design and oonstructlon methods Is an
<br />o Graduate Courses, Tulans
<br />invaluable asset.
<br />and LSU
<br />Registration/Certification
<br />Project Specific Experience
<br />1990 Registered Civil
<br />Los Angeles County Six Public Parks, Low Angeles, CA
<br />Engineer CA 046979
<br />Ms. Wagner managed and suporvised the laid surveying, mapping and civil designfor
<br />• 1982 PE In Civil Engineering
<br />six parks throughout the county. All mapping and contours were CARD generated. Ms.
<br />LA420270
<br />Wagner supervised grading; hydrology and ADA -compliant construction plans, Cost
<br />. 1067 Licensed Land
<br />estimates were generated end assistance was given to contractors in the bidding
<br />Surveyor CA 95752
<br />process.
<br />1989 Lifetime Instructor
<br />Credential, Engineering, CA
<br />Metria Northern Canoga Extension of the Change Line EIR & PE, San Fernando
<br />Community College System
<br />Valley, CA
<br />+ 2004 LEEDe Accredited
<br />Ms. Wagner supervised the survey and rlght-cf way portionof the project, which
<br />Professional
<br />Included a 4 -mile, bike, path, She managed the photogrammetric field surveying, aerial
<br />Professional societies/
<br />Profess;
<br />mapping and right-of-way engineering for the 4rmile northern extension of existing
<br />Affi•
<br />Orange Line from the Canoga Station to the Chatsworth Metroiink.9tation. The mapping
<br />1998 LA Chapter President,
<br />& digital terrain models (tOTM's) Were delivered to the Metro certified to exceed National
<br />1993 -Presort, Board
<br />Mapping Accuracy Standards, Ms. Wegner supervised the 10 topographic; station
<br />Member a sent, Director
<br />surveys along the route and the legal descriptions and plate of the design-identifled
<br />American Council of
<br />acquisition areas,
<br />Engineering Companies
<br />(ACEC)
<br />San Fernando Class 9 Bikeway, Burbank CA
<br />a US Careen Building Council
<br />Ms. Wagner managed the field survey and right-of-way enginooring effort for the
<br />Preliminary Engineering phase of this proposed bike path. She supervised the
<br />a CA Land Surveyors
<br />production of theprellminary rlghtof--way map which was mathematically compiled from
<br />Association (CLSA)
<br />detailed roaaarch of existing records Including documents and maps from the City of
<br />a ACEC, Trustee, Business
<br />Burbank, UP/MTA/SCRRA railroad Right -of -Way, County Flood Control Right -of -Way,
<br />Insurance Trust
<br />and private parcels determined from the County of Los Angeles Assessor Maps,
<br />Awards
<br />recorded Tract and Parcel Maps and Records of Survey and Corner records.
<br />0 1996 National Association of
<br />Women Business Owners
<br />County of Loa Angeles Hollywood Bowl RenevationfExpanslon
<br />(NAWBO) Woman of the
<br />Project, Los Angeles, CA
<br />Year in Construction
<br />Me, Wagner as the Civil Project Manager provided the civil engineering design
<br />• 2005 & 2011 ACEC Member
<br />services for the construction of the three additional escalators at the Hollywood Bowl,
<br />Firm of the Year
<br />She also oversaw the field survey and topographic survey mapping tasks that were
<br />. 2019 ACEC Engineering
<br />performed for the elevator designs, The WES team also provided construction staking,
<br />Excelience Award Metre 1-
<br />710 Corridor Project
<br />City of Santa Monies Ishihara (Buffer) Park
<br />. 2014 ACEC Engineering
<br />Ms, Wagner managed the construction surveying services for this new park bulif
<br />Excellence Award LABOE
<br />between Stewart Street and Dorchester Avenue In Santa Monica. Eight unique mom -
<br />White Paint Landslide Project
<br />like garden spaces were created. WES established a control network, located utilities,
<br />• 2015 Fellow - ACEC
<br />perfomaod rough grade and fine grade pavement surveys under the supervision of Ms,
<br />Wagner,
<br />
|