Kane Galloway, P.E.
<br />DRAINAGE AND WATER QUALITY
<br />Katie specializes In hydrology and other water related services such as stormwater
<br />management and. best management practices, Katie has been involved in wet utility
<br />design, storm drain design, water quality analysis, water quality reports, hydrology
<br />analysis, and task management. Katie Is proficient in a variety of software packages such as
<br />Mlc6 tation, AutoCAD Civil 3d, S.tormC.AD, InRoAds,..FlowMaster,. CulvertMastor and ProjectWise,
<br />Professional Credentials
<br />Master, Applied Ocean Science (Mechanloal Engineering), University of California, San Diego
<br />Bachelor of Science, Civil and Environmental Engineering, University of Maryland
<br />Professional Engineer in California (484222)
<br />American Society of Civil Engineers (ASCE), Member
<br />Engineers Without Borders, Member
<br />Relevant Experience
<br />I Mission Avenue Streatecape -A
<br />Green/Complete Streets, Oceanside, CA —
<br />Project Engineer
<br />• National City, Community Corridors
<br />Improvements, 4th Street, National City, CA —
<br />Analyst
<br />f ACE, Phase I I Grade Separations PS&E,
<br />Fullerton Road Grade Separation, City of
<br />Industry, CA --
<br />/ East County Bus Maintenance Faollity, Master
<br />Plan and Construction Documents, San Diego,
<br />CA a-- Project Engineer
<br />f Euclld Avenue Pedestrian & Bicycle
<br />Enhancements, National City, CA —
<br />• Groton Casino - Wilfred Avenue Off -Site
<br />Improvements, Rohnart Park, CA —Analyst
<br />./ Volgt Drive/1-5 North Coast Corridor (NCC)
<br />Improvements (PS&E), San Diego, CA
<br />Project Engineer
<br />d Willow Street Bridge Replacement Phase 2,
<br />Chula Vista, CA —Analyst
<br />J Heyward I.880/SR 92 Reliever Route, Hayward,
<br />CA — Analyst
<br />A I-215Nan Buren Blvd Interchange PA&ED and
<br />PS&E Phases, Riverside County, CA —Analyst
<br />• 1-5/Genesoe PR/ED, PS&E and Construction
<br />Phase Services (CPS), San Diego, CA —
<br />Analyst
<br />e Martin LutherKing Community -Oriented Skate
<br />Park (aka Sidswinder Skate Park), EJ Centro,
<br />CA — Analyst
<br />• Palm Ave. and 1.805 Interchange Widening
<br />(Bridge), San Diego, CA —Analyst
<br />A Rancho Coronado Villages Design Services - A.
<br />Public/Private Partnership, San Marcos, CA —
<br />Project Engineer
<br />J RCTD,1-10 Bypass, Riverside County, CA —
<br />Project Engineer
<br />i Rahabllitation of Willow Street Bridge over the
<br />Sweetwater River, Chula Vista, CA— Project
<br />Engineer
<br />i Safari Park Wastewater Treatment Plant
<br />Expansion (aka Water Pipeline Upgrades and
<br />Safari Park Grant Support), San Diego, CA m
<br />Project Engineer
<br />I SANDAL, Final Design of the South Line
<br />Freight Rail improvements, San Diego, CA —
<br />Project Engineer
<br />J SANDAG, Mid -Coast -100% Final Design
<br />Phase, sub to PS, San Diego, CA --Project
<br />Engineer
<br />i SANDAG/MTS Light Rall Transit (LRT) Renewal
<br />Project —Blue Line Stations, San Diego, CA —
<br />Analyst
<br />i UCSD Traffic Study for 1-5/Gllman Drive
<br />Advanced Technology Bridge project, San
<br />Diego, CA — Project Engineer
<br />Kim1,%ft;1y1*i ern
<br />
|