Laserfiche WebLink
Dave Luzuriaga, P.E., QED/P <br />EROSION CONTROL. AND SWPPP - TASK MANAGER <br />ImmDave has been involved In a multitude of projects over his 25-year, oareer, His <br />background Includes a wide range of civil engineering projects for higher eduostlon <br />facilities and land.deveiopment projeots.in Southern California. His overall grasp of <br />general civil engineering, the process involved, and the ever -complicated permit approvals has <br />consistently appealed to clients, <br />Professional Credentials <br />Bachelor of Science, Civil Engineering, California Polytechnic State University, San, Luis Obispo <br />Professional Engineer In California (0673 4) <br />qualified SWPPP Developer/Practitioner (400887) <br />California Board f0 Civil. Ehgineers and Land Surveyors, Board Member <br />Relevant Experiende <br />• Bepflower Unified School District, Mayfair High <br />School STEAM Building, Track and Field Stadium, <br />end Additional Improvements, Lakewood, CA — <br />Project Manager <br />• Lake Elsinore. Unified School District, Elsinore High <br />School, Synthetic Baseball Field end Courtyard <br />Redesign, Widomer, CA •-- Project Manager <br />I Long Beach City College, Master Plan. Update for <br />New Sports Complex and'Kinesfotcgy and Health <br />Education Building, Long Beach, CA --Project <br />Manager <br />• Orange Unified School District, Orange High <br />School improvements, Orange, CA •-- Project <br />Manager <br />I Rio Hondo College, Nursing Village, Transit <br />Center, and Library Tower, Whittier, CA-- Project <br />Manager <br />er Viewpoint School, AtE Services for Sports Facility <br />and Two Parking Lots, Calabasas, CA — Project <br />Manager <br />/ Long Beach City College, Due Diligence, New <br />Sports Complex, and new Kinesiology Building, <br />Long Beach, CA —Project Manager <br />/ Rio Hondo College, Nursing Village, Transit <br />Center, and Library Tower Seismic Retrofit, <br />Lakewood, CA — Project Manager <br />/ Cypress College, Baseball Field, Cypress, CA <br />Project Manager <br />J Orange Coast College, Substation, Costa Mesa, <br />CA — Project Manager <br />Kimley>)) Horn <br />A Fullerton College, Softball Field, Softball Betting <br />Cage ADA Upgrados, Fullerton, CA ---Project <br />Manager <br />.J College of the Canyons, Soscor Field and <br />Accessibility Upgrades, Santa Clarita, CA — <br />Project Manager <br />• El Camino College, Campus Wide Utility Mapping, <br />and Water Main Relocation Plan, Torrance, CA -- <br />Project Manager <br />• Viewpoint School, Preliminary Design of Three <br />Parking Lots, Six Tennis Courts, Sewer Alignment, <br />and Multl-Use Synthetic Sports Field, Calabasas, <br />CA— Project Manager <br />• Meter Del High School, Parking Lot Re -Striping, <br />ADA Upgrades, New Modular Building, and <br />Portables, Santa Ana, CA — Project Manager <br />Mayfair High School, interim Classroom Modular <br />Village, New $TEAM Building, New Track and <br />Field Stadium, New Synthetic Sports Field, LA <br />County Culvert Design and Conversion of open <br />Channel, and Storm Drain Percolation Field, <br />Lakewood, CA — Project Manager <br />J Elsinore High School, New Synthetic Baseball <br />Field, Courtyard Redesign, Wildomar, CA -- <br />Project Manager <br />• Orange High School, New STEM Building, Design <br />of the Interim Portable Village, Campus Wide Utility <br />Upgrades, and Relocation of a Bus Drop Off, <br />Orange, CA — Project Manager <br />