Karina Fidler, AiCP, CPESC
<br />ENVIRONMENTAL AND SWPPP -- TASK MANAGER
<br />Karins ties nearly 20 years of experience as an environmental planner prpviding Held
<br />fnvestlg@tions and 0WA and NEPA documentation for pubiio and private sector
<br />projects. she has completed numerous Phase 1 Environmental Site Assessments,
<br />Phase it ESAa, snvlronmental.pianning doouments, and wetland delineations, In additlon to
<br />environmental services,. Kerins has also prepared Stormwater Pollution Prevention Plans for private
<br />developments and public. works improvements, and has eonducted.weekiy end rain event inspections for
<br />Projects under the Statewide General Construction Permit. Her responsibilities also Include doordinatlon
<br />with the,contractorthrough the construction process to:assure the Best Management Practices controls
<br />are Installed and maintatned,:and that the site isIn full compliance with the Permit. Karin@ is also trained
<br />to measure pH and turbidity in the field during storm events, as required by the Permit for high risk sites..
<br />Professional (Credentials
<br />Master of Science, Public Health/ Environmental Health, San Dlfrgo State University
<br />Bachelor of science, Blologioal Sciences, University of Califomla, Santa Barbara
<br />American Institute of Certified Planners, (4020016)
<br />Certified Profeaeional in Erosion & Sediment Control (#7165)
<br />Relevant Experience
<br />I Civil Engineering Design Services . Santiago
<br />Detention Basin, Temooula, CA —
<br />Environmental Planner
<br />• Intersection and Drainage. Improvements at
<br />Frank Sinatra Drive and Portole Avenue, Palm
<br />Desert, CA --• Environmental Planner
<br />• San Diego County As -Needed Environmental
<br />Services, San Diego, CA. . Project Manager
<br />• San Diego River Bikepath, Ocean Beach
<br />Bikepath/lAotei Circle North (aka Mission Valley
<br />Bikeway Feasibility Study), San Diego, CA —
<br />Environmentbl Planner
<br />• Main Street Promenade (Linear Park A Street
<br />Vacation), Lemon Grove, CA — Project
<br />Engineer
<br />4 Bakersfield Master Plan Development (Meadow
<br />Field Airport) AKA Wingspbint, Bakersfield,. CA
<br />-- Environmental Planner,
<br />• Bayshore Bikeway Environmental
<br />Documentation.and Final Design, San Diego,
<br />CA— Environmental Planner.
<br />I Santa Rosa Road Widening Project, Camarillo,
<br />CA— ProjoctEngineer
<br />Kimley>»Horn
<br />A City of Stockton, Installation of Emergency
<br />Vehicle Pre-Emption(EVP) at Various Looatlons,
<br />Stockton, CA -- Environmental Planner
<br />Del Dios Gorge Trail Feasibility Study,
<br />Escondido, CA— Environmental Planner
<br />Douglas Park -Long Beach (Boeing), Long
<br />Beach, CA —Environmental Planner
<br />i Faraday Avenue, Carlsbad, CA --
<br />Environmental Planner
<br />Harbor Boulevard Smart Street Feasibility Study
<br />and Environmental Documentation, Garden
<br />Grove, CA — Environmental Planner
<br />• 1-2161Van Buren Blvd interchange PA&ED and
<br />PS&E Phases, Riverside County, CA —
<br />Environmental Planner
<br />A 1-6/Genesee PRIED, PS&E and Construction
<br />Phase Services (CPS), San Diego, CA --
<br />Environmental Planner
<br />• Broadway Plaza Expansion, Walnut Creek, CA
<br />—Environmental Planner.
<br />
|