Laserfiche WebLink
Karina Fidler, AiCP, CPESC <br />ENVIRONMENTAL AND SWPPP -- TASK MANAGER <br />Karins ties nearly 20 years of experience as an environmental planner prpviding Held <br />fnvestlg@tions and 0WA and NEPA documentation for pubiio and private sector <br />projects. she has completed numerous Phase 1 Environmental Site Assessments, <br />Phase it ESAa, snvlronmental.pianning doouments, and wetland delineations, In additlon to <br />environmental services,. Kerins has also prepared Stormwater Pollution Prevention Plans for private <br />developments and public. works improvements, and has eonducted.weekiy end rain event inspections for <br />Projects under the Statewide General Construction Permit. Her responsibilities also Include doordinatlon <br />with the,contractorthrough the construction process to:assure the Best Management Practices controls <br />are Installed and maintatned,:and that the site isIn full compliance with the Permit. Karin@ is also trained <br />to measure pH and turbidity in the field during storm events, as required by the Permit for high risk sites.. <br />Professional (Credentials <br />Master of Science, Public Health/ Environmental Health, San Dlfrgo State University <br />Bachelor of science, Blologioal Sciences, University of Califomla, Santa Barbara <br />American Institute of Certified Planners, (4020016) <br />Certified Profeaeional in Erosion & Sediment Control (#7165) <br />Relevant Experience <br />I Civil Engineering Design Services . Santiago <br />Detention Basin, Temooula, CA — <br />Environmental Planner <br />• Intersection and Drainage. Improvements at <br />Frank Sinatra Drive and Portole Avenue, Palm <br />Desert, CA --• Environmental Planner <br />• San Diego County As -Needed Environmental <br />Services, San Diego, CA. . Project Manager <br />• San Diego River Bikepath, Ocean Beach <br />Bikepath/lAotei Circle North (aka Mission Valley <br />Bikeway Feasibility Study), San Diego, CA — <br />Environmentbl Planner <br />• Main Street Promenade (Linear Park A Street <br />Vacation), Lemon Grove, CA — Project <br />Engineer <br />4 Bakersfield Master Plan Development (Meadow <br />Field Airport) AKA Wingspbint, Bakersfield,. CA <br />-- Environmental Planner, <br />• Bayshore Bikeway Environmental <br />Documentation.and Final Design, San Diego, <br />CA— Environmental Planner. <br />I Santa Rosa Road Widening Project, Camarillo, <br />CA— ProjoctEngineer <br />Kimley>»Horn <br />A City of Stockton, Installation of Emergency <br />Vehicle Pre-Emption(EVP) at Various Looatlons, <br />Stockton, CA -- Environmental Planner <br />Del Dios Gorge Trail Feasibility Study, <br />Escondido, CA— Environmental Planner <br />Douglas Park -Long Beach (Boeing), Long <br />Beach, CA —Environmental Planner <br />i Faraday Avenue, Carlsbad, CA -- <br />Environmental Planner <br />Harbor Boulevard Smart Street Feasibility Study <br />and Environmental Documentation, Garden <br />Grove, CA — Environmental Planner <br />• 1-2161Van Buren Blvd interchange PA&ED and <br />PS&E Phases, Riverside County, CA — <br />Environmental Planner <br />A 1-6/Genesee PRIED, PS&E and Construction <br />Phase Services (CPS), San Diego, CA -- <br />Environmental Planner <br />• Broadway Plaza Expansion, Walnut Creek, CA <br />—Environmental Planner. <br />