Laserfiche WebLink
OC Streetcar Peer Review, Orange County, CA (2016 — Ongoing) <br />Kimloy-Horn Is providing peer review of the streetcar design for various technical areas such as track alignment, grade <br />crossings, stations, signalization, Overhead CatenarySystem,.Traction Power Sub Station, constructablllty, basic <br />operations, and overall coordination of the proposed corridor with bicycles, pedestrians, buses, and other Vehicles, <br />The OC Streetcar will increase transportation options and provide greater access to a 4.15-mile route along Santa Ana <br />Boulevard, 4th Street, and the Pacific Electric right-of-way to Harbor Boulevard In Gordon, Grove, <br />Clent Reference: City of Santa Ana, Jason Gabriel, PrIpoipal Clv(1 Enginaaf, 714,647.6604 <br />On -Call, General Engineering Services, Malibu, CA (2012 — Ongoing) <br />Klmley-Horn was originally selected to provide on-omll traffic engineering services to the City of Malibu. In 2012, but the <br />contract was later expanded to Include Civil. Engineering Services, due to high quality servios..proyided.by Klmley-Hom. <br />As extension to the City Staff,.Kimiey-Morn staff performs the following on a regular basis; <br />o Performing review of development projsct reports, Preparing construction plans, specificatlons, and <br />grading, utility and construction plans estimates <br />Conducting engineering and traffic surveys + Researching of utilities and other records <br />Feasibilityloonceptual studies and reports and Collecting and analyzing traffic data <br />recommendations for preliminary, final and construction participating in meetings with City staff associated with <br />design studies various development and improvement projects <br />• Utilizing applicable engineering disciplines <br />Client Reference: City of Malibu, Rob Duboux, Assistant Public Works Director, 310.456,2489439 <br />City of Pomona On -Cali, Pomona, CA (2011— 2013) <br />Klmley-Horn was selected through an on -call agreermant with the City to provide street rehabilitation services for various <br />streets within the City. The genarai scope of Work was to evaluate the sulteble pavement rehabilitation methodologies <br />and select the methods that were most sultabie for the Citft budget, this project also included Isolated concrete <br />Improvements including, sidewalk, curb and gutter, crossguttors, curb ramps,, bus pads, and medians, Some of the <br />pavement rehabilitation methods that were evaluated ware cold In -place recycling, conventional asphalt removal and <br />replacement, and cold mill and overlay. Each method was evaluated with conventional asphalt andrubberized asphalt, <br />Client Reference; City of Pomona, Reza Zolghadr, Consultant Project Manager, 909.820.22n <br />On -Call Pavement RehabilitationlUtility Design, Fontana, CA (2008 — Ongoing) <br />Klmley-Worn. has completed pavement rehabilitation design under several task orders: <br />Catawba Avenue, SloverAvanue, HemlockAvanue, Beech Avenue, and PopularAvenuo: Improvements entailed <br />pavement replacement and overlays per geotechnicai recommendations; miscellaneous concrete Improvements where <br />adjacent Improvements were affacted; and reconstructioniresetiing of affected private property improvements such as fences, <br />walls, curb drains, and motors. Various pavement rehabilitation options were Investigated; conventional asphalt concrete <br />replacement was recommended along one -street and full -depth asphalt recyclingn <br />(FDAR) along the others. The construction cost savings by going with FDAR were0. <br />sum <br />approximately 40 percent in comparison to conventional remove•and-replace ; <br />options. Coordination was required to obtain permits for work adjacent to two �f <br />UPRR at grade rail crossings and for work associated with affected utilities. <br />Klmley-Horn also assisted the City in applying for Preposition 1B funds through <br />the State and Local Partnership Program (SLPP). <br />City of Santa Ana I TROO77OR5.17 13 Kimley*Horn <br />