"Y, P.E.
<br />ER QUALITY
<br />d other water related services such as stormwater
<br />lent practices. Katie has been involved to wet utility
<br />r quality analysis, water quality reports,, hydrology
<br />A variety of software packages such as.
<br />FlowMaster, CulvertMoster and ProjaetWiss,
<br />Professional Oredientials
<br />Master, Applied Ocean Science (Mechanical Engineering), University of California, San Diego
<br />Bachelor of Science, Civil and Environmental Engineering, Uriivorsity of Maryland
<br />Professional Engineer In California.(04222)
<br />American Society of Civil. Engineers (ASCE), Member
<br />Engineers Without Borders, Member
<br />Relevant Experience
<br />• Mission Avenue Streetscape - A
<br />Green/Complete Streets, Oceanside, CA —
<br />Project Engineer
<br />i National City, Community Corridors
<br />Improvements, 4th Street, National City, CA --
<br />Analyst
<br />1 ACE, Phase i1 Grade. Separations PS&E,
<br />Fullerton Road Grade Separation, City of
<br />Industry, CA—
<br />• East County Bus Maintenance Facility Master
<br />Plan and Construction Documents, San Diego,.
<br />CA — Project Engineer
<br />A Euclid Avenue Pedestrian & Bicycle
<br />Enhancements, National City, CA —
<br />A Graton Casino - Wilfred Avenue OB-Site
<br />Improvements, Rohned Park, :CA —Analyst
<br />w Voigt Drive/1-5 North Coast Corridor (NCC)
<br />Improvements (PS&E), San Diego, CA --
<br />Project Engineer
<br />./ Willow Street Bridge Replacement Phase 2,
<br />Chula Vista, CA —Analyst'
<br />/ Hayward 1-8801SR 02 Reliever Route, Hayward,
<br />CA — Analyst
<br />I 1-21$Nan Buren Blvd Interchange PA&ED and
<br />PS&E Phases, Riverside County, CA--- Analyst
<br />J I-8/Genesea PRIED, PS&E and Construction
<br />Phase Services (CPS), San Diego, CA ---
<br />Analyst
<br />• Martin Luther King Community.Oriented Skate
<br />Park (eke Sidewinder Skate Park), El Centro,
<br />CA — Analyst
<br />• Palm Ave. and 1.80E Interchange Widening
<br />(Bridge), San Diego, CA —Analyst
<br />I Rancho Coronado' Villages Design Services - A
<br />Public/Private Partnership, San Marcos, CA —
<br />Project Engineer
<br />a RCTD, 1.10 Bypass, Riverside County, CA —
<br />Project Engineer
<br />J Rehabilitation of Willow Street Bridge over the
<br />Sweetwater River, Chula Vista, CA — Project
<br />Engineer
<br />J Safari Park Wastewater Treatment Plant
<br />Expansion (aka Water pipeline Upgrades and
<br />Safed Park Grant Support), San Diego, CA —
<br />Project Engineer
<br />i SANDAL, Final Design of the South Line
<br />Freight Rail Improvements, San Diego, CA —
<br />Project Engineer
<br />• SANDAG, Mid -Coast -100% Final Design
<br />Phase, sub to PB, San Diego, CA — Project
<br />Engineer
<br />J SANDAG/MTS Light Rail Transit (LRT) Renewal
<br />Project- Blue Line Stations, San Diego, CA —
<br />Analyst
<br />e UCSD Traffic study for I-S/Gilman Drive
<br />Advanced Technology Bridge project, San
<br />Diego, CA — Project Engineer
<br />KidepMorn
<br />
|