Karina Fidler, AICP, CPESC
<br />ENVIRONMENTAL AND SWPPP — TASK MANAGER
<br />Karim has nearly 20 years of experience as an environmental planner providing field
<br />Investigations and CEQA and NEPA documentation for public and private sector
<br />projects. She has.complated numerous Phase 1 Environmental Site Assessmfrnts,
<br />Phase II ESAs, environmental planning documents, and wetland delineations, In addition to
<br />environmental services, Kenna has also prepared Stormwater Pollution Prevention Plans for private
<br />developments and public, works Improvements, and has conducted Weekly end rain event Inspections for
<br />,projects under the Statewide.General Construction Permit Her responsibilities also include coordination
<br />with the contractor through the construction process to assure the Best Management Practices controls
<br />are Installed and maintained, and that the site is:in full compliance with the Permit. Kerins is also trained
<br />to measure pH and turbidity In the field during storm events, as required by the Permit for high risk sites.
<br />Professional Credentials
<br />Master of Science, Public Health/ Environmental Health, San Diego State University
<br />Bachelor of Science, Biological 5olences, University of California, Santa Barbara
<br />American Institute of Certified Planners, (#020016)
<br />Certified Professional in Erosion & Sediment Control (#7105)
<br />Relevant Experience
<br />• Civil Engineering Design Services- Santiago
<br />Detention Basin, Temecula, CA—
<br />Environmental Planner
<br />/ Intersection and Drainage Improvements at
<br />Frank Sinatra Drive and Portola Avenue, Palm
<br />Desert, CA— Environmental Planner
<br />• San Diego County As-Noeded Environmental
<br />Services. San Diego, CA — Project Manager
<br />® San Diego River Bikepath, Ocean Beach
<br />Bikepath/Hotel Circle North (aka Mission Valley
<br />Bikeway Feasibility Study), San Diego; CA --
<br />Environmental Planner
<br />• Main Street Promenade (Linear Park - A Street
<br />Vacation), Lemon Grove, CA —Project
<br />Engineer
<br />• Bakersfield Master Plan Development (Meadow
<br />Field Airport) AKA Wingspoint, Bakersfield,. CA
<br />— Environmental Planner,
<br />J Bayshora bikeway Environmental
<br />Dooumentation and Final Design, San Diego,
<br />CA— Environmental Planner,
<br />• Santa Rosa Road Widening Project, Camarillo,
<br />CA --Project Engineer
<br />Kimley>))Horn
<br />:/ City of Stocldon, Installation of Emorgengy
<br />Vehicle Pro-Emptlon(EVP) at Various Locations,
<br />Stockton, CA -- Environmental Planner
<br />Del Dios Gorge Trail Feasibility Study;
<br />Escondido, CA -- Environmental Planner
<br />I Douglas Park -Long Beach (Boeing), Long
<br />Beach, CA — Environmental Planner
<br />d Faraday Avenue, Carlsbad, CA —
<br />Environmental Planner
<br />• Harbor Boulevard Smart Street Feasibility Study
<br />and Environmental Documentation, Garden
<br />Grove, CA -- Environmental Planner
<br />d 1.216/Van Buren Blvd Interchange PA&ED and
<br />PS&E Phases, Riverside County, CA —
<br />Environmental Planner
<br />• I-6lGenesee PR/ED, PS&E and Construction
<br />Phase Servicas,(CPS), San Diego, CA —
<br />Environmental Planner
<br />.d Broadway Plaza Expansion, Walnut Creek, CA
<br />— Environmental Planner.
<br />
|