Laserfiche WebLink
Karina Fidler, AICP, CPESC <br />ENVIRONMENTAL AND SWPPP — TASK MANAGER <br />Karim has nearly 20 years of experience as an environmental planner providing field <br />Investigations and CEQA and NEPA documentation for public and private sector <br />projects. She has.complated numerous Phase 1 Environmental Site Assessmfrnts, <br />Phase II ESAs, environmental planning documents, and wetland delineations, In addition to <br />environmental services, Kenna has also prepared Stormwater Pollution Prevention Plans for private <br />developments and public, works Improvements, and has conducted Weekly end rain event Inspections for <br />,projects under the Statewide.General Construction Permit Her responsibilities also include coordination <br />with the contractor through the construction process to assure the Best Management Practices controls <br />are Installed and maintained, and that the site is:in full compliance with the Permit. Kerins is also trained <br />to measure pH and turbidity In the field during storm events, as required by the Permit for high risk sites. <br />Professional Credentials <br />Master of Science, Public Health/ Environmental Health, San Diego State University <br />Bachelor of Science, Biological 5olences, University of California, Santa Barbara <br />American Institute of Certified Planners, (#020016) <br />Certified Professional in Erosion & Sediment Control (#7105) <br />Relevant Experience <br />• Civil Engineering Design Services- Santiago <br />Detention Basin, Temecula, CA— <br />Environmental Planner <br />/ Intersection and Drainage Improvements at <br />Frank Sinatra Drive and Portola Avenue, Palm <br />Desert, CA— Environmental Planner <br />• San Diego County As-Noeded Environmental <br />Services. San Diego, CA — Project Manager <br />® San Diego River Bikepath, Ocean Beach <br />Bikepath/Hotel Circle North (aka Mission Valley <br />Bikeway Feasibility Study), San Diego; CA -- <br />Environmental Planner <br />• Main Street Promenade (Linear Park - A Street <br />Vacation), Lemon Grove, CA —Project <br />Engineer <br />• Bakersfield Master Plan Development (Meadow <br />Field Airport) AKA Wingspoint, Bakersfield,. CA <br />— Environmental Planner, <br />J Bayshora bikeway Environmental <br />Dooumentation and Final Design, San Diego, <br />CA— Environmental Planner, <br />• Santa Rosa Road Widening Project, Camarillo, <br />CA --Project Engineer <br />Kimley>))Horn <br />:/ City of Stocldon, Installation of Emorgengy <br />Vehicle Pro-Emptlon(EVP) at Various Locations, <br />Stockton, CA -- Environmental Planner <br />Del Dios Gorge Trail Feasibility Study; <br />Escondido, CA -- Environmental Planner <br />I Douglas Park -Long Beach (Boeing), Long <br />Beach, CA — Environmental Planner <br />d Faraday Avenue, Carlsbad, CA — <br />Environmental Planner <br />• Harbor Boulevard Smart Street Feasibility Study <br />and Environmental Documentation, Garden <br />Grove, CA -- Environmental Planner <br />d 1.216/Van Buren Blvd Interchange PA&ED and <br />PS&E Phases, Riverside County, CA — <br />Environmental Planner <br />• I-6lGenesee PR/ED, PS&E and Construction <br />Phase Servicas,(CPS), San Diego, CA — <br />Environmental Planner <br />.d Broadway Plaza Expansion, Walnut Creek, CA <br />— Environmental Planner. <br />