Laserfiche WebLink
♦011 <br />4�TWINING <br />Amir Gbavibazoo, Ph.D., Senior Pavement Engineer <br />W. Amir Ghavibazoo Is the Senior Pavement Enpineer at Twining, Inc. He directs and works on <br />pavement design, highway design, and engineering sppolficatlops, puring his graduate study, Amlr <br />obta(ned extensive knowledge and expertise on Pavement Management Systems (Micropaver), <br />Pavement Evaluation and PavementRehatillItefloni Strategies, He Is an expert in calculating Pavement <br />Condition Index (POi) through visual Inspection following the United Stated Army Corps of Engineers' <br />methodology, as well as conducting Life Cycle Cast Analysis (LCCA) rehabilitation strategies for <br />pavements. Amir has extensive practical experience In asphalt pavement engineering Including <br />pavement design; rehabilitation, preservation, pavement management, materials; and construction. His <br />experience includes the characterization of rubberized asphalt binders and developing mix designs <br />following Suparpove specifications. He works closely with citles and government agencies to develop <br />unique and specialized mix designs, pavement constructions Inspections, and pavement design <br />solutions. <br />Overview <br />In the industry since 2074 <br />Joined Twining in 2014 <br />Education <br />Ph,p.. In Civil and Environmental Engineering <br />North Dakota.State University <br />Master of Sclonce In Railways Engineering <br />Iran University of Selene and Technology, Tehran, Iran <br />Project Experience Summaries <br />City of Huntington Beach, Nichols Lane Rehabilitation Twining performed Inspection and <br />material testing on this project. Amir served as project manager to assure the quality of the job <br />that was being delivered to the City. He oversew the material sampling and testing and provided <br />technical comments to the City. He was also responsible for developing Cement treated soil mix <br />design for the City. <br />• City of Claremont, Foothill Boulevard Improvement Twining performed pavement evaluation <br />on approximately four lane miles of Foothill Boulevard in the City of Claremont to recommend <br />repair and rehabllitaton strategies for the pavement. Amir served as senior pavement engineer, <br />coordinating the required testing and preparation of the final recommendation and design. <br />Several alternative options were provided to the City, including mill and overlay, Cold In -Place <br />recycling, reconstruction, and soil stabilization. <br />• Pavement Evaluation A Repair Recommendations at Various Parks Twining performed <br />network level pavement evaluation on approximately 20 lane miles of road In various parks of <br />Forest Lawn in Southern California to develop a 5-year plan for rehabilitation of the road network. <br />Amir was the lead Pavement Engineer on this project, coordinating all required surface evaluation <br />tasks, data collection, and preparation of the final report. <br />• City of El Monte, Ramona Boulevard Resurfacing Pavement Evaluation This project <br />consisted of repairing the PS&E and related construction documents for the 2014- 2015 STP-L <br />Ramona Boulevard Street Resurfacing project. Twining performed geotechnical pavement <br />avnlnatinne anti rphAhIlltatinn rnnnmmanrlatlnno fnr thlq nrninnt Amir msmAd as the nnvempnt <br />