My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2018 11:11:31 AM
Creation date
7/24/2018 10:46:34 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2018-159-07
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
1/1/1900
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERING SERVICES <br />RFP NO.: 17-083 <br />P City of Santa Ana <br />PROPOSAL <br />Roadway <br />The proposed total street width will be 120 feet, consistent with the City's Street standards for a major <br />separated Arterial. Mark Thomas understands very well how the City can accommodate all of the project <br />elements into the desired roadway width. <br />The existing 14 -foot raised landscaped median will be protected -In-place. Turn pockets and turn bay lengths <br />shall be modified as needed or as dictated by the supporting traffic report. <br />G' Buffer <br />Prop <br />Exist <br />12` Lanes Median 3-12' Lanes I S' <br />alis or New <br />t _ 0 Property <br />-------------- <br />-- Rehab Exist Pavemen Landscape Exist K <br />(Where Possible) Median (Upgrade) <br />J Bikeway <br />Proposed (Roadway Improvements <br />Buffer <br />Landscaping <br />It Is understood that both the proposed parkways and the raised bike lane buffer will be planted per the <br />latest water conservation requirements, and per the City's preferences and pallete requirements. The final <br />landscaping will match the adjacent project aesthetics that were recently completed. <br />In addition to the parkway landscaped strip, any unused property behind the sidewalk will be considered for <br />SMP Installations, <br />Proposed Street Section <br />for <br />120NIGHT or WAY <br />Typical Section at POW Constraint <br />
The URL can be used to link to this page
Your browser does not support the video tag.