Laserfiche WebLink
CONTACTINFO TOM AGUNA, AAGP <br />tom-acunaCnv5.cpm <br />949.585.0477 ErlvIroriMental Manager. <br />EXPERIENCE <br />36years <br />EDUCATION <br />8A, Business <br />Administratipn <br />Associates Arts Degree <br />LICENSES <br />American institute of <br />Certified planners LIc, <br />016829 <br />Hazardous Materials <br />& Site `Assessment <br />Certlfloatlon, University <br />of CalifomiaSorr Diego <br />extension-19ge <br />Certified Environmental <br />Surveyor SDG&E .1994 <br />Mr. Aouna currently directs the efforts of NV5's Environmental Group, performing all <br />aspects of environmental support, He has more than S5 years of experience obtaining <br />local, state, and federal approvals fdr electric and gas proledts, Duties Include supervising <br />eight Field Environmental Speoiailate speola.li,zing in,blologleal and, environmental <br />permitting. He was responsible for preparing regulatory strategies to obtain permits, <br />reviewing and editing-teghnipal reports, preparing environmental releaees, coordinatioo:of <br />construction monitoring,, tracking and assigning projects, and program administration of <br />state and faderal perndts, clearing the way for 80G:operations In California's central valley <br />and desert regions. <br />Project Expoftlince <br />Escondido Expedited Elattery 30 MW/120MWH and El Cajon ( $DG&E <br />Tam was responsible foe ensuring environmental and safety compliance for two large <br />lithium Ion battery storage ystema. This technalogy is relatively new to investor utilities <br />and required comprehensive review of manufacture apeoificatione and operational <br />eoquirementsto minlmize.SWG&E riak. <br />EGO Substation PTC Application I SDG&E <br />Prepared the Eco Substation Proponent Environmental Assessment and oversaw <br />the Joint EIR/EIS. This document described and evaluated proposed improvements <br />consisting of a new 100-acre substation/switchyard, expansion to an existing <br />sutnstatIOn, and constrUACM of a 18-mile transmission line to connect them. The PTC <br />granted the application 1n June 2012. <br />Mountain Empire Major use Permit I County of San Diego <br />Tom worked with this team obtain Major Use Permit from the County of San Diego <br />to allow a heavy equipmenttraining facility. Key CEQA Issues were visual and noise <br />Impacts. At this direction, Torn conducted a CEQA initial study and employed measures <br />so that the project qualified fora Mitigated Negative Declaration. Project completed In. <br />2011, <br />Hazardous Material Assessment j City of Coachella <br />Tom developed and provided a hazardous material assessment (Phase 1) related to <br />the removal of water line48 from a street position and private property. The phase I <br />identified historical contamination and Its relationship to hazardous material related to <br />the water line. Completed June 2017. <br />San Diego Natural Gas Pipeline CFCN Application i SDG&E <br />Suppoitedthe project during the routing phase of a new 47_-mile gas line. Provided <br />opportunities and constraint mapping, Identified feasible alternatives, Identified <br />regulatory requirements at multiple locations, and oversaw efforts of environmental <br />team in 2016 to prepare a project Proponents Environmental Assessment, The CPCN <br />NIV 5 application is currently under consideration at CPUC). <br />