Laserfiche WebLink
GEOSCIENCE TERRY A, WATKINS, JR. PG, Cl <br />Senior Geohydrologist <br />Mr. Watkins has over fourteen years of experience in many different types of <br />projects, including geohydroloelc Investigations, ground water quality studies, <br />artificial recharge projects, water well test drilling programs, sea water <br />desalination programs, and the management and supervision of water well <br />projects Inciutithg: siting, design, aquifer pumping test analyses and well <br />construction, I,14ted below are various OkOmPles of Mr. Watkins' experience: <br />City of South Pasadena — Rehabilitation of Wilson Wolf N2. 2016 <br />Developed rehabilitation recommendations and Work -plan for contractor <br />activities. Served as project and construction manager during rehabilitation, <br />r t n , 6kCk as n redevelopment, and testing of the well. This Work'suceessfuily doubled <br />production capablllty of this well. <br />University, Pomona, 2003, <br />Professional Registrations: <br />iwalltornia Professional Geologist <br />(No. 9046) <br />City of Huntington Beach — Replacement of Well No,1, <br />2014to Present <br />Prepared preliminary design documents and drawings as well as technical <br />plans and specifications forthe drilling, construction, development, and <br />testing of the City of Huntington Beach Replacement Well No,1, Will provide <br />construction management services, including well design recommendations, <br />during construction activities which should begin second quarter of 2017. <br />West Valley Water District —Rialto Colton Monitoring Well No,1, <br />2015 to 2016 <br />Project manager for the drilling, design, construction, and development of a <br />910 ft stainless steel monitoring well to serve as a sentinel well monitoring <br />perchlorate migration. <br />Certified California Hydrogeologist, Pico Water District. 2016 to present <br />(No. 1038) Project manager overseeing all aspects of this project. Tasks completed to <br />date include well siting assessment and recommendation, drafting of technical <br />plans and specifications, contractor bid assistance, and permitting with <br />regulatory agencies, Construction and testing are scheduled to begin in <br />March, 2017 <br />�Y <br />