Laserfiche WebLink
CITY OF SANTA ANA ADDENDUM No. One <br />PROPOSAL Exhibit A <br />PROJECT NO,; 18.6907 <br />LOCAL STREET PREVENTATIVE MAINTENANCE FY 2017-18 <br />BID PROPOSAL <br />TO; CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM; All American Asphalt <br />REQUIREMENT: <br />ADDENDUM No. One <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule; <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation 4: <br />60 <br />CY <br />T(6—D,-00T;000 <br />, OO <br />2 <br />Cold Mill (2") <br />182,200 <br />SF <br />$ p, Z,0 <br />$ <br />3 <br />AC Pavemont <br />2,370 <br />TN <br />$ $ l • ro0 <br />$ 44'01 lro5.00 <br />4 <br />Rubberized Emulsion Aggregate Slurry <br />(REAS) Type 11 * <br />1,960 <br />TN <br />$ OoCD. oD <br />Lttvo,� <br />5. <br />PCC Curb & Gutter (Type A-2-6) <br />45 <br />LF <br />-VZ3 t • (al) <br />6 <br />d^7 <br />Grind PCC Gutter <br />100 <br />LF <br />$ -k , oo <br />$ 'L.,100. O6 <br />Trea Root shaving <br />1 <br />IIA <br />$ V 6 y, oo <br />$ F g 2, no <br />8 <br />Grade Manhole Prame & Cover to Finished <br />Gr <br />Grade <br />25 <br />co <br />$ L L, 3M.ce <br />9 <br />Furnish and Install Now water Valve Framc <br />& Cover to Finished Grade <br />23 <br />t L (c L•5 Act <br />10 <br />Crack Scaling <br />v <br />LS <br />$In"l4t�•�� <br />$`90900.Ob <br />11 <br />Protection of Surface Utility Frames and <br />Covers <br />1 <br />LS <br />$ 4 52 c�0 <br />$ 9 S72 00 <br />12 <br />Remove Existing Striping, Pavement <br />Legends, and Markers <br />1 <br />LS <br />$ 3O,I5 •00 <br />$ 30,1'56, 00 <br />13 <br />Signing & Striping <br />1 <br />.LS <br />$ 3e p c7•C7b <br />$ 3p 6C 00 <br />14 <br />Labor Agreement Oversight <br />I <br />LS <br />$ '15,000 <br />$ 15,000 <br />P-1. of P-1.7 <br />