Laserfiche WebLink
ESA4 ESA 2018 Schedule of FeeB <br />ISCO215O Area Velocity Flow Logger <br />$ 25 <br />$ 100 - <br />$ -350 <br />Logging Rain Gage <br />10 <br />40 <br />125 <br />Marsh-McBlrney Hand -Hold Current Meter <br />50 <br />200 <br />FloWav Surrace Velocity Radar <br />50 <br />200 <br />Logging Water Level- Pressure Transducer <br />10 <br />30 <br />100 <br />Logging Barometric Pressure Logger <br />5 <br />15 <br />50 <br />Well Probe / Water Level Meter <br />20 <br />80 <br />Bottom -Mounted Tripod / Mooring <br />25 <br />100 <br />400 <br />Handheld Suspended Sediment Sampler <br />20 <br />260 <br />� <br />Logging Turbidimeter;Water Level Recorder <br />$ 25 <br />$ ioo <br />$ $ aoo <br />Logging ConductivilylWater Level Recorder <br />20 <br />60 <br />200 <br />In -Situ Troll 950011 water quality mulllprobe <br />200 <br />800 <br />Logging Temperature Probe <br />$ <br />10 <br />40 <br />Hach Hand -Held Turbidlmeter Recording Conductivity Meter <br />50 <br />200 <br />w/Datalogger <br />Refraclometer <br />20 <br />80 <br />YSI Hand -Held Salinity Meter or pH meter <br />30 <br />120 <br />Hand -Held Conductivlty/Dissolved Oxygen Probe (YSI 85) <br />40 <br />160 <br />HOBO Salinity Gauge <br />125 <br />Water quality Sonde <br />60o <br />YSI 650 with 6920 Multi Probe <br />180 <br />500 <br />1500 <br />_ ISCO 6712 Portable Sampler WISCO 2105 Module <br />40 <br />250 <br />900 <br />Peat Corer $ 75 $ 300 <br />Salto Helly-Smith Bedload Samplerwith Bridge (;ratio 175 700 <br />Suspended Sediment Sampler with Bridge Crane 75 300 <br />Guelph Permoameter 50 200 <br />Vora -core 100 400 <br />Shear Strength Vane 50 200 <br />Auger (brass core Q $ 5/each) 20 80 <br />Boats: <br />14' Aluminum Boats with 15 HP Outboard Motor $ 100 $ 400 <br />Single or Double Person Canoe/Kayak 30 121 <br />20' Lowe Boat W/115 HP Outboard 300 1,500 <br />17'_Boston Whaferw/00 HP Outboard <br />a Actual project charges will be either the IRS mileage reimbursemeot rate or the dally rate, whichever is higher. <br />III, Subcontracts <br />Subcontract services will be invoiced at cost multiplied by 1.15. <br />IV, Other <br />The fees above do not include sales tax. Any applicable or potential sales tax will be charged <br />when appropriate. <br />