8�ttfrpp$AL "' R.ra <ry � '
<br />Civic Center Stornewater Li fCStudon Renovae!on Design servlres
<br />Mujahld Chandoo, PE I Hydrology / Hydraulic Review
<br />Y%
<br />Mujahld Chandoo is a Project Manager with Michael Baker with more than
<br />12 years of experience in surface water management. Mujahld has an in-
<br />depth understanding of the stormwater issues for the proposed Civic Center
<br />a Stormwater List Station Renovation Project through his involvement on the
<br />City's Storm Drain Master Plan Update Project where Michael Baker
<br />analyzed the main line drainage system and prepared a hydrology study
<br />along with maps for the entire city boundary and for individual sub -areas for
<br />2-, 10-, 25-, and 100 -year storm events. The capacity of the existing storm
<br />drainage was evaluated to determine system capacity sufficiency using a
<br />hydrodynamic hydraulic model. A comprehensive list of needed storm drainage improvements
<br />was then generated. Mujahid's areas of expertise include hydrology, hydraulics, sediment
<br />transport and advanced modeling.
<br />Project Team Summary Qualifications Table
<br />Highlighted below are the qualification of our team. Resumes are included at the end of this section
<br />ixxs A 0 A Y I°x AL d
<br />Sofa Kamangar, PE,
<br />20 M.S„ Civil Engineering
<br />Civil Engineer, CA, C70118
<br />Project Management
<br />I .
<br />City of Brea, Pump Stations 2 and 3
<br />PMP, CCM, QSD
<br />B.S., Civil Engineering
<br />.
<br />Rehabilitation
<br />Project Manager
<br />50%
<br />j
<br />Professional (PMP), 1863656
<br />Certified Construction Manager,
<br />,
<br />Garden Grove Sanitary District, Tiffany
<br />6341
<br />Pump Station Replacement
<br />Envision Sustainability
<br />Moulton Niguel Water District, Paseo
<br />Professional
<br />De Valencia Sewer Lift Station
<br />Qualified SWPPP Developer
<br />Rehabilitation
<br />Jahn Nagle, PE
<br />Principal -In -Charge
<br />31 M.S., Civil Engineering
<br />KS.,
<br />Civil Engineer, CA, 46972
<br />City of Whittier Pumping Plant No 2
<br />Civil Engineering
<br />Also registered in NV, AZ, UT,
<br />Replacement
<br />and Guam
<br />R-28 Reservoir, P-27 Pumping Station
<br />--
<br />and PRV-Stations 12_3, and 125
<br />Ghartes Palzone, PE
<br />Project Engineer
<br />7 M.S., Civil Engineering
<br />B.S., Civil Engineering
<br />Civil Engineer, CA, 84048
<br />_124 _----..._..
<br />Cit of Ontario RW 8 stem
<br />Hyperion Secondary Effluent Pump
<br />60%
<br />Station
<br />_.. ___.- __--
<br />Pacific Grove Local Proact
<br />Bohn Moynier, CEP,
<br />l 36 M A., Computer
<br />Certified Environmental
<br />_Water ..--_-
<br />Long -Te m Facilities Plan PEIR, OCWD
<br />CPM
<br />Assisted Cartography
<br />Professional, USA, 2014,
<br />Area Drainage Master Study, Flood
<br />QC Manager
<br />B.S,, Geography-
<br />#14041431
<br />Control District of Maricopa County
<br />15%
<br />Ecosystems
<br />Certified Floodplain Manager,
<br />Program Management for FloodSAFE
<br />.._USA
<br />1.11- LI2008 US -08-03663
<br />California, California DWR
<br />Mujahid Ghandoa, PE
<br />12 B.S., Civil Engineering
<br />Civil Engineer CA, 76633
<br />City of Santa Ana Stoon Drain Master
<br />Hydrology/Hydraulic
<br />Plan
<br />Review
<br />City of Anaheim, Master Plan of Storm
<br />20%
<br />Drainage for North and West Santa Ana
<br />River Tributary Areas
<br />Karl Meier, PE
<br />15 B.S., Civil Engineering
<br />Civil Engineer, CA, 71713
<br />City of San Buenaventura, North Bank
<br />Technical Review
<br />Construction Quality Management
<br />Lift Station Upgrades
<br />10%
<br />for Contractors, SPK-USACE-
<br />>
<br />County of Orange, Los Alamitos Pump
<br />02.18-00060
<br />Station Reconstruction
<br />.
<br />Spring Canyon Sewer Lift Station,
<br />Newhall County
<br />ixxs A 0 A Y I°x AL d
<br />
|