My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHAEL BAKER, INC.
Clerk
>
Contracts / Agreements
>
M
>
MICHAEL BAKER, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2021 5:20:27 PM
Creation date
8/7/2018 12:56:56 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHAEL BAKER, INC.
Contract #
A-2018-177
Agency
Public Works
Council Approval Date
7/17/2018
Expiration Date
7/17/2021
Insurance Exp Date
8/30/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />Civic Centar.5tormwaterUft5tation Rennvotiun ttesigoServtces <br />CCTV inspection and concrete core samples taken out of the manhole structure. The assessment <br />found that the existing force mains were in sufficient condition for rehabilitation instead of <br />complete replacement. The final design included a structural CIPP liner for each force main. <br />Electrical and Instrumentation. Electrical and instrumentation design was <br />provided for the entire pump station including the submersible pump <br />station, compressed air, cooling system, fuel systems, building lighting and <br />HVAC. The design also Included a 280 kW generator to back up loads at <br />the pump station except for the main pumps, which have a separate <br />propane back up system. <br />Structural. Structural design was provided for the 130' by 55' buildingXMIZ <br />N&; <br />with separate rooms for the engine, electrical equipment, compressed <br />air, and storage. Reinforcement for the roof accommodated a 5 -ton <br />bridge crane lifting system that reaches all areas within the engine 600 <br />room. Design also included a 30' deep main wet well separated by bay walls for each pump, a low <br />flow wet well, and an inlet apron to transition to the retarding basin. <br />Site Civil Design and Phasing. Site civil design included design of paving, grading, drainage, <br />access roads, and yard piping. Design also included locating equipment such as a generator, <br />propane tanks, air receiver tank, storage building, electrical equipment, and a storage building. <br />Constraints of the site civil design included working around an environmental wetland, keeping the <br />existing pump station in service, an existing overhead transmission line going through the site, <br />and fire department access requirements <br />Architecture and HVAC. Architectural and HVAC design was provided to meet the requirements <br />of the County of Orange, City of Long Beach, and City of Seal Beach. The building included <br />masonry walls with stucco finish, and a tiled roof facing the nearest residents. Ventilation design <br />includes a series of 12 exhaust fans. <br />Construction Support and Commissioning. Extensive construction support was provided by <br />the Michael Baker team in the form of shop drawing reviews, RFI responses, regular meetings, <br />and construction observation. Some of the biggest issues that came up during construction were <br />complying with fire department requirements, and environmental permitting requirements. <br />Commissioning services were provided to assist the County with setting the requirements for <br />starting up the pump station and making it fully operational. <br />Additional Support, There was a myriad of other critical support services provided on this project <br />that all contributed to the success of the project, including multi -agency permitting and <br />coordination, CEQA compliance, regulatory permitting (Army Corps, Department of Fish and <br />Wildlife, RWQCB), survey, landscape design, stormwater compliance, geotechnical, physical <br />modeling, dry utility coordination, acoustical analysis, and public outreach. <br />1HY4KHATf4NA4 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.