Laserfiche WebLink
PROPOSAL ram <br />Civic Center StormwoterLitStotionRenovation NAP ervtces <br />Avalon Catherine Booster Station and Pebbly Beach Lift Station CIF' Projects I <br />Avalon, CA <br />Client: City of Avalon, 410 Avalon Canyon Road, Avalon, CA 90704 <br />Reference: Mr, Bob Greenlaw, Public Works Director. (310) 510-0220, <br />reenlawof ,cityofavalon.com <br />Year: 2017 <br />Team Member Involved: Marek Przywara (Electrical Engineer) <br />Michael Baker provided design and construction services for the Avalon Sewer CIP Electrical <br />Improvements Project that consisted of upgrades to electrical Infrastructure for the Catherine <br />Boaster Station and Pebbly Beach Lift Station, including City SCADA integration. <br />The Catherine Booster Station required replacement of the existing Motor Control Center (MCC) <br />line-up with a new MCC panel and included the following tasks: removing of existing MCC panel <br />and replace with new NEMA 4X rated MCC. MCC panel line-up included the control panel with <br />Mission Communication RTU and SCADA communication equipment; replacing existing cables to <br />(2) 120 HP booster pumps; replacing main 400 -amp feeder incoming to the new MCC panel; <br />reconnecting all existing equipment to new panel including ATM power next to panel; reconnecting <br />e)dsting instrumentation, control and signal wires to new panel terminal strip; providing conduits <br />entering or leaving the vault with the approved duct seal. The project also included heater/fan <br />system to prevent condensation; panel lighting and duplex 20A 110 VAC power plug; Ethernet <br />switch; phone jack to access existing telephone connection and Sensaphone RTU; spare Ito cards <br />for future SCADA upgrade in panel, etc.; and providing specification and engineering cost estimate. <br />The Pebbly Beach Lift Station required removal of the existing Edison Meter Switchboard and <br />electrical distribution equipment from the vault and installing the new NEMA 4X rated meter main <br />and distribution equipment above ground level. The project included the following tasks; <br />coordination with SCE; removal of existing NEMA 1 rated Edison Meter Switchboard from the dry pit <br />and replace it with new 250 Amps NEMA 4X rated Metered Switchboard; intercepting existing <br />Edison conduit and re-routing to new meter panel; removal of NEMA 1 rated City -owned Auto <br />Transfer Switch (ATS) from the dry pit and replace it with new 250 Amps NEMA 4X rated above <br />ground ATS; removal of sub panel and step down transformer from the dry pit and replaced it with <br />NEMA 4X rated Mini Power Center (MPG) panel above ground; replacement of non -explosion proof <br />lights, receptacles, sensors and auxiliaries with the explosion proof equipment in the dry pit; <br />providing explosion proof fittings/seats for all cables entering or leaving the vault (dry pit), <br />IN it AN Al 10 1 nb 16 <br />