Laserfiche WebLink
PROPOSAL & <br />Civic Center StormwoterUftStotion Renovation Design Services <br />, <br />NAN Chandoo, P.E. <br />Hydrology / Hydraulic Review <br />Mr. Chandoo has extensive experience in surface water <br />s Professional Affiliations: <br />management. His areas of expertise include hydrology, <br />3 American Society of Civil <br />hydraulics, sediment transport and advanced modeling. He has <br />I Years of Experience: 12 <br />been involved with a variety of projects including, but not limited <br />r <br />to, storm drain master plans throughout Southern California, <br />Education/Training: <br />! EduEdu 2006, Civil Engineering, <br />storm drain design, FEMA processing, sediment transport <br />? California State university at <br />modeling, environmental documentation, and large scale 2- <br />Fullerton <br />dimensional floodplain studies.Mr. Chandoo has extensive <br />A.S., 2003, Mathematics, <br />experience in using advanced hydraulic 1 D/2D modeling for <br />Fullerton College <br />surface and sub -surface flooding analysis. <br />LLioonses/Certifications: <br />drainage was evaluated to determine system capacity <br />Professional Engineer - Civil, <br />PYOj<eC$ Experience <br />California, 2010, 76633 <br />Santa Ana Storm Drain Master Plan, Santa Ana, California. <br />s Professional Affiliations: <br />City of Santa Ana. Engineer responsible for hydrology and <br />3 American Society of Civil <br />hydraulics analysis. Michael Baker provided professional <br />Engineers, Los Angeles <br />engineering services to update the city's storm drain master <br />section/ Orange County <br />plan. The city has an established drainage system with some <br />Branch, Member <br />segments over 50 years old and other segments recently <br />Engineers Without Borders <br />constructed. Michael Baker analyzed the main line drainage <br />(EWB), Orange County, <br />system and prepared a hydrology study along with maps for the <br />I Kenya Team - Travel Member <br />entire city boundary and for individual sub -areas for 2-, 10-, 25-, <br />I Environmental & water <br />and 100 -year storm events. The capacity of the existing storm <br />Resources Institute (EWRI), <br />Orange County, President <br />drainage was evaluated to determine system capacity <br />I (November 2013 -October <br />sufficiency using a hydrodynamic hydraulic model. A <br />2014) <br />comprehensive list of needed storm drainage improvements <br />I Environmental & water <br />was then generated. Michael Baker performed a hydraulic <br />Resources Institute (EWRp, <br />analysis to size sufficient storm drain lines and provided an <br />orange County, Past <br />ESRI ARCGIS geodatabase of city storm drain facilities, <br />President - 2016 <br />Including storm drain pipes, city -owned drainage channels, <br />Environmental & water <br />manholes, catch basins, and culverts. Michael Baker used the <br />( Resources Institute (EWRp, <br />software hydrodynamic h draulic model CivilStorm, <br />1 -OC, Treasurer (OctoberBentle <br />2012.October 2013) <br />which uses hydrographs with in the hydraulic model to <br />determine adequate pipe sizing. <br />Midway City Street and Storm Drain Master Plan and <br />Improvements, Midway City, California. County of Orange. <br />Engineer responsible for hydrology and hydraulic modeling, <br />facility alignments and sizing, and cost estimating. Michael <br />Baker provided professional services for the preparation of <br />drainage and street master plans for the recommendation of <br />improvements for the Midway City area of unincorporated <br />Orange County to alleviate flooding within a residential area by <br />designing roadway rehabilitation improvements and installing <br />storm drain mainline and local improvements to convey the area <br />storm drain runoff, and to provide increased protection for <br />motorists and pedestrians. Michael Baker's services included <br />inrenxnryiaxaL Mujahid Chandoo, P.E. <br />