Laserfiche WebLink
WINDOW BOARDING SPECIFICATION <br />WINDOW - OUTSIDE VIEW <br />NOTES: <br />V2" CDX PLYWOOD <br />CUT TO TO COVER <br />WINDOW OPENING <br />1 SECURE TO STRUCTURE <br />WITH 1-5/8" (60) <br />GALVANIZED NAILS <br />2 X 4 BRACE <br />CUT TO OUTSIDE <br />DIMENSION OF <br />WINDOW TRIM <br />2 X 4 BRACE <br />CUT TO SIZE OF <br />PLYWOOD <br />316" CARRIAGE BOLT <br />12' LONG/COURSE THREAD <br />NUT TO MATCH, WASHERS INSTALLED <br />ON BOTH SIDES <br />ROUNDED HEAD OF BOLT ON OUTSIDE <br />1. FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS BOLTS <br />THROUGH OPENINGS AT TOP AND BOTTOM. <br />2. STORM WINDOWS SHOULD BE REMOVED AND STORED INSIDE STRUCTURE. <br />3. OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br />TIGHT FIT. <br />4. TIGHTEN NUTS FROM INSIDE ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br />5. BRACE LOCATIONS: A = 1/3 B (SEE DIMENSION LOCATIONS ON DRAWING) <br />NOTE: WINDOWS 3 FEET IN HEIGHT OR SHORTER ONLY REQUIRE ONE <br />BRACE. <br />6. LOCATION OF BOLT HOLES: C = 1/3D (SEE DIMENSION LOCATIONS ON DRAWING) <br />7. THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12" ALONG <br />THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND WITH <br />DECK NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />DOOR BOARDING SPECIFICATIONS <br />City of Santa Ana RFP 18-060 <br />2SA-31 <br />r----------------------------- I <br />t 1 <br />A <br />C <br />I <br />: <br />6 . . . . . . . . . . . . . ; <br />1 I <br />1 1 <br />1 1 <br />1 1 <br />1 I <br />1 1 <br />1 1 <br />1 <br />I 1 <br />1 1 <br />1 1 <br />1 I <br />1 I <br />1 I <br />1 1 <br />1 1 <br />A <br />I I <br />1 <br />----------------------------- <br />WINDOW - OUTSIDE VIEW <br />NOTES: <br />V2" CDX PLYWOOD <br />CUT TO TO COVER <br />WINDOW OPENING <br />1 SECURE TO STRUCTURE <br />WITH 1-5/8" (60) <br />GALVANIZED NAILS <br />2 X 4 BRACE <br />CUT TO OUTSIDE <br />DIMENSION OF <br />WINDOW TRIM <br />2 X 4 BRACE <br />CUT TO SIZE OF <br />PLYWOOD <br />316" CARRIAGE BOLT <br />12' LONG/COURSE THREAD <br />NUT TO MATCH, WASHERS INSTALLED <br />ON BOTH SIDES <br />ROUNDED HEAD OF BOLT ON OUTSIDE <br />1. FOR DOUBLE HUNG WINDOWS, SLIDE SASH TO CENTER OF UNIT AND PASS BOLTS <br />THROUGH OPENINGS AT TOP AND BOTTOM. <br />2. STORM WINDOWS SHOULD BE REMOVED AND STORED INSIDE STRUCTURE. <br />3. OUTSIDE TRIM MAY HAVE TO BE REMOVED TO ACCOMMODATE A FLUSH AND <br />TIGHT FIT. <br />4. TIGHTEN NUTS FROM INSIDE ENOUGH TO SLIGHTLY COMPRESS 2X4 BRACE. <br />5. BRACE LOCATIONS: A = 1/3 B (SEE DIMENSION LOCATIONS ON DRAWING) <br />NOTE: WINDOWS 3 FEET IN HEIGHT OR SHORTER ONLY REQUIRE ONE <br />BRACE. <br />6. LOCATION OF BOLT HOLES: C = 1/3D (SEE DIMENSION LOCATIONS ON DRAWING) <br />7. THE PLYWOOD BOARD SHOULD BE SECURED WITH SCREWS EVERY 12" ALONG <br />THE PERIMETER OF THE FRAME OF THE WINDOW, DOOR, OR OPENING, AND WITH <br />DECK NAILS AT EVERY 6" MARK WHERE SCREW IS NOT PLACED. <br />DOOR BOARDING SPECIFICATIONS <br />City of Santa Ana RFP 18-060 <br />2SA-31 <br />