My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT HAZARDOUS MATERIALS SURVEYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25F - AGMT HAZARDOUS MATERIALS SURVEYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 7:29:46 PM
Creation date
8/16/2018 7:20:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25F
Date
8/21/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 18-043 <br />Al - Environmental She Assessment <br />collected on March 16, 2012. This exceeds LTCP criteria of 100 mg/kg, which may hinder the <br />ability to close the site. As such, the RWQCB may require that soils in known hot -spot areas be <br />excavated and removed between approximately 5 and 10 feet bgs, or to first encountered <br />groundwater. <br />• The HHRE conducted during the Phase II ESA may determine a VEC for future residential <br />occupants. Because of this, future residential site structures may require vapor mitigation <br />measures. The most cost-effective mitigation measure for this site will likely be to Install a vapor <br />barrier as part of the foundation system of new structures. The additive construction costs for <br />such a system is estimated to be approximately $3-$7 per square foot of foundation. <br />Once the RWQCB agrees to case closure and termination of the groundwater monitoring program, Ninyo <br />& Moore will obtain permits from OCHCA to abandon the groundwater monitoring wells in accordance <br />with California Well Standards Bulletin 74-90 and OCHCA permit regulations and requirements. The <br />RWQCB will send the RP a correspondent letter notifying when it is appropriate to proceed with well <br />abandonment/decommissioning activities. Additionally, a "no further action" letter will be issued for the <br />site to document case closure after all necessary administrative/procedural processing and public <br />notification requirements have been completed in accordance with agency guidance/protocol and <br />applicable law. <br />ANTICIPATED DELIVERABLES <br />Ninyo & Moore anticipates the following deliverables will be prepared for this work: <br />• Scoping Document for the City and RWQCB <br />• Phase I ESA Report including VEC evaluation <br />• Phase II ESA Work Plan (Including SAP, QAPP, HASP, and CHASP) <br />• Permit applications <br />• Phase If ESA Report (including <br />waste manifests) <br />• Groundwater Monitoring Report <br />• Site Closure Report <br />• Permit closeout submittals <br />• Cost to Closure Estimate <br />HHSE, geophysical survey report, analytical laboratory reports, and <br />PROPOSED SCHEDULE <br />Ninyo & Moore's proposed schedule to perform Tasks 1 through 6 at the ARCO Service Station #5147 in <br />Santa Ana includes the following: <br />Preparation of Phase I ESA 4 weeks <br />of the Phase II ESAWork Plan 1 week <br />Annual Groundwater Monitoring Event 1 week , <br />Permit closeout submittals & Cost to Closure Estimate 12 weeks <br />Nlnyo & Moore I City of Santa Ana - (A1) Environments 29Fcn_s311 05-00713 1 June 5, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.