Laserfiche WebLink
Anthony J. Lizzi <br />Contract Manager <br />at 56 various City parks for presence of lead In soil. Mr. Lizzi Is responsible for client interaction, and has extensive technical and <br />practical experience In all aspects of assessing surface and subsurface geology, geochemistry, and contamination of soil, soil <br />vapor, and groundwater. <br />Los Angeles Department of Water and Power (LADWP), On -Call Environmental Consulting Services Contract Los An- <br />geles, California: Principal Geologist for environmental projects such as Phase I and Phase II ESAs for this on-call contract at <br />various sites throughout the LADWP footprint. Reviewed Phase I ESA reports on numerous sites in Southern California ranging <br />from vacant, undeveloped land to Industrial properties. Managed the Phase 11 ESA Feld activities at numerous LADWP sites for <br />soil, soil gas, and groundwater investigations. Performed senior review of technical documents. <br />City of Colton, Guyaux Landfill, Phase II Work Plan, Colton, California: Principal Geologist managed the preparation of a <br />Phase I ESA, Phase II Work Pian and Phase 11 ESA Implementation at a waste disposal site (WDS) measuring 4 acres to charac- <br />terize and delineatethe lateral and vertical extent of the wastes, Including additional Investigation of previously Identified "hot spot <br />areas of "soil" containing elevated lead concentrations. The work plan and the results of the Phase II ESA will be used to assist <br />with evaluating whether the WDS can be capped/covered so the City can construct a 29 -acre soccer complex and community <br />park. <br />Port of Long Beach, On -Call Environmental Consulting Services Contract: Under the new, three -year -tens contract, Mr. <br />Lizzi is the Principal Geologist for the environmental services being performed In the areas of, but not limited to, Identification of <br />hazardous materials used in the construction of buildings and appurtenance, including, but not limited to, asbestos containing <br />materials, PCBs, and lead-based paint, or stored within or outside of any facilities; physical and chemical sampling and analyses <br />for detection and delineation of surface and subsurface contamination of soil and groundwater; and small scale removal and/or <br />abatement of asbestos containing materials and lead-based paint from structures scheduled for demolition or renovation. <br />Anaheim Union High School District, Proposed School, Anaheim, California: Technical Advisor for a PEA of the West <br />Lincoln Avenue properties site along West Lincoln Avenue and North Ohio Street In Anaheim, California, The school district Is <br />considering obtaining the site, which is adjacent to the Anaheim High School. In general, land use in the.vicinky of the site is <br />primarily commercial and residential, and records indicated several of the current structures present since at least 1927. Ninyo & <br />Moore's Phase I ESA identified some potential historical environmental issues including; former gasoline stations; and potential <br />lead based paint and organochlorine pesticides. Nlnyo & Moore designed sampling and analyses for these issues in a PEA work <br />plan approved by the Department of Toxic Substances Control (DTSC) and performed the PFA. During the PEA, Ninyo & Moore <br />conducted the soil and soil gas sampling in accordance with the PEA work plan, which followed the most current DTSC guidance <br />documents. The field work Included collecting over 400 X -Ray florescence (XRF) readings and soil sampling results surrounding <br />the historic site buildings. The results of the PFA have been presented to, and approved by, the DTSC. The PEA Includes a health <br />risk screening evaluation of COPCs detected in the shallow soil. We are assisting the school district with obtaining the School <br />Cleanup Agreement with the DTSC which will proceed with the preparation of the Removal Action Work plan, <br />California Department of General Services, Phase 11 Subsurface Investigation, Hollywood, California. Project manager for <br />a Phase II subsurface investigation at a downtown parcel to assess recognized environmental conditions. Managing development <br />of a field sampling and analysis program to evaluate the nature of any hazardous materials or substances that may be present in <br />soil, soil gas, and groundwater at the subject site. <br />Anthony J. Lint, PG, CNG, Contract Manager I Ninyo & Moore I Geotochnical & Environmental Sciences Consultants <br />25F-45 <br />