Laserfiche WebLink
APPENDIX A -TABLE 1 <br />ESTIMATED DEVELOPMENT COSTS <br />SANTA ANA ARTS COLLECTIVE <br />SANTA ANA, CALIFORNIA <br />I. Property Assemblage Costs <br />Property Acquisition Costs <br />2 <br />43,299 <br />Sf Land <br />$171 <br />/Sf Land <br />$7,405,000 <br />Relocation Costs <br />2 <br />1,473,000 <br />Closing Costs <br />0.5% <br />Purchase Price <br />34,000 <br />Total Property Assemblage Costs <br />$8,912,000 <br />II. Direct Costs <br />3 <br />Off-site Improvements <br />$376,000 <br />On-site Improvements <br />43,299 <br />Sf Land <br />$11 <br />/Sf Land <br />469,000 <br />Adaptive Reuse & New Const Costs <br />4 <br />74,499 <br />Sf GBA <br />$189 <br />/Sf GBA <br />14,080,000 <br />Furnishings, Fixtures & Equipment <br />350,000 <br />Contractor Fees / General Requirements <br />12% <br />Construction Costs <br />1,791,000 <br />Construction Bonds <br />2% <br />Construction Costs <br />299,000 <br />Contingency Allowance <br />3% <br />Other Direct Costs <br />521,000 <br />Total Direct Costs <br />58 <br />Units <br />$308,400 <br />/Unit <br />17,886,000 <br />III. Indirect Costs <br />Arch, Eng, Consulting & Construction Mgt <br />16% <br />Direct Costs <br />$2,862,000 <br />Public Permits & Fees <br />6 <br />58 <br />Units <br />$28,220 <br />/Unit <br />1,637,000 <br />Taxes, Insurance, Legal & Accounting <br />3% <br />Direct Costs <br />537,000 <br />Marketing & Leasing <br />58 <br />Units <br />$2,414 <br />/Unit <br />140,000 <br />Developer Fee <br />6 <br />8% <br />Eligible Basis <br />2,000,000 <br />Contingency Allowance <br />2% <br />Other Indirect Costs <br />144,000 <br />Total Indirect Costs <br />$7,320,000 <br />IV. Financing Costs <br />Interest During Construction <br />Predevelopment Loan <br />7 <br />$206,000 <br />Construction Loan <br />a <br />$21,260,574 <br />Loan Amount <br />4.86% <br />Interest <br />995,000 <br />Financing Fees <br />Construction Loan <br />$21,260,574 <br />Loan Amount <br />1.25 <br />Points <br />266,000 <br />Permanent Loan <br />$3,442,000 <br />Loan Amount <br />1.50 <br />Points <br />52,000 <br />Operating Reserve <br />3 <br />Months Operating Expenses / Debt Service <br />162,000 <br />TCAC Fees <br />' <br />97,000 <br />V. <br />Total Financing Costs $1,778,000 <br />Total Construction Costs 58 Units $465,200 /Unit $26,984,000 <br />Total Development Costs 58 Units $618,900 /Unit $35,896,000 <br />2 An appraisal prepared on June 27, 2017 estimates the As -Is market value of the property at $8,200,000. <br />2 Based on Developer estimate. LACAL Consulting, Inc. prepared a relocation plan on May 31, 2016 and estimated the relocation costs at $907,000. <br />However, the report underestimaterd the lease termination options. The Developer provided back-up documenation for the additional costs. <br />3 Estimates assume prevailing wage requirements will not be imposed on the Project. <br />4 Based on Developer estimate. The Developer provided a general contractor contract and change orders to support the construction cost estimates. <br />s Based on Developer estimate. The estimate should be verified by City staff. <br />6 This is the maximum amount allowed to be included in the Project by TCAC. <br />7 Based on Developer estimate. <br />6 Includes debt on the 78% of the Tax Credit Equity which will not be funded during construction. Assumes a 21 -month development period with a <br />55% average outstanding balance. <br />3 Includes a $2,000 application fee; $410/unit monitoring fee; and 4% of the gross Tax Credit proceeds for one year. <br />Prepared by: Keyser Marston Associates, Inc. <br />Filename: Meta -8 618; PF_9%; trb 25J-47 <br />