My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25L - AGMT VETERANS VILLAGE PROJ
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
25L - AGMT VETERANS VILLAGE PROJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2018 7:24:30 PM
Creation date
8/16/2018 7:21:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25L
Date
8/21/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />4. The general conditions and contractor fees are estimated at 5% of construction costs, <br />which is lower than the maximum 14% allowed by TCAC and the typical 10-12% <br />allowance. The Developer plans to use Quality Development and Construction, Inc., a <br />related party, as the Contractor for the Project. <br />5. Construction insurance is estimated at 2% of construction costs. <br />6. A 10% contingency allowance is provided. <br />KMA concludes that the proposed direct costs are reasonable and necessary for the <br />construction of the Project per the proposed scope of work. <br />/ndim-ctCasts <br />KMA and Developer utilized the following assumptions for the indirect costs: <br />1. Architecture, engineering and consulting costs are estimated at 8% of direct costs, or <br />$1,345,000. <br />2. Developer estimated the public permits and fees costs at $1,193,000, or $15,700 per <br />unit. <br />3. The taxes, insurance, legal and accounting costs are estimated at 3% of direct costs, or <br />$487,000. <br />4. The marketing and leasing budget equates to $110,000, or $1,447 per unit. <br />5. The Developer will receive a $2,200,000 developer fee, which is the maximum allowed <br />by TCAC. <br />6. A 6% indirect cost contingency allowance is provided. <br />The total indirect costs are estimated at $5,661,000, which KMA concludes are reasonable and <br />necessary for the development of the Project. <br />Financing Costs <br />The financing costs for the Project are estimated as follows: <br />1. Century Housing Corporation, provided a $4,400,000 acquisition loan to the Project, <br />which closed escrow in January 2017. The loan has a 6.59% interest rate. Assuming a <br />13 -month loan term, the interest owed during the development period is estimated at <br />$314,000. <br />2. The construction period and absorption period debt service payments are estimated at <br />$974,000. This estimate is based on the following assumptions: <br />City of Santa Ana Underwriting & Subsidy Layering Review: Veteran's Village Page 15 <br />25L-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.