My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-08-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
08/21/2018
>
FULL PACKET_2018-08-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:35:26 AM
Creation date
8/20/2018 1:50:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
8/21/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 10-031 <br />d. Understanding of Need <br />The City of Santa Ana desires to continue Its efforts in installing security lighting systems by <br />using the same hardware and fixtures as those recently installed at: Fisher Park, Santiago Park, <br />Heritage Park, Santa Anita Park, Windsor Park, Madison Park, Lillie King Park, Bomo Koral <br />Park. <br />Parks that require lighting upgrades are as follows: <br />Pacific Electric Bike Trail — Phase 1 currently does not have electrical or lighting systems. <br />Irrigation controllers with electrical connection points are on site. Lighting shall be <br />designed for the entire length of the trail from McFadden Avenue to Occidental Street. <br />Saddleback View Park currently does not have electrical or lighting systems, An irrigation <br />controller with electrical connection point is on site. Lighting shall be designed for the <br />meandering walkway in the park. <br />Morrison Park currently has lighting for the basketball and tennis courts only. Additional <br />lighting, including additional power supply equipment and facilities, shall be designed for <br />the interior meandering walkway and the parking lot. The electrical system shall be <br />centralized and serve all lights in the park. <br />AAIDS GROUP Page 9 <br />25B-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.