Laserfiche WebLink
5 YEAR BUDGET MAINTENANCE PLAN <br />The following includes a list of goals and time tables based on the Court Analysis <br />Survey. These timetables can be used in budgeting for short and long term <br />projects. <br />Sub ect__ <br />Description _ <br />Schedule <br />Laser Grading <br />Laser grading should be considered every <br />Every 10-15 <br />& V lift <br />10-15 years. <br />years <br />Top -Dress <br />Topdressing is necessary for each annual <br />Annually <br />opening, 1-2 tons of Har -Tru per court <br />should be applied with each top -dress. <br />Line Tape <br />Line Tapes should be pulled up prior to top <br />Annually <br />replacement <br />dressing. This will ensure that lines are <br />straight, tight and have no surface material <br />buildup on either side of line tapes during <br />the playing season. <br />_ <br />Windscreens <br />Windscreens should be replaced every 3-5 <br />Now <br />years or as they start to fade, discolor and <br />& <br />et brittle. <br />3-5 years <br />Fencing -Hard <br />Fencing should be painted or replaced as <br />As Needed <br />Courts <br />needed. Keeping this project in a cycle will <br />help to eliminate a build up of high <br />budgetary Costs. _. <br />Tools & <br />__ <br />Keeping Brushes and Hand tools in good <br />_ <br />Drag <br />Equipment <br />working condition is essential for great Har- <br />Brushes, <br />Tru courts. Replacing worn .brushes, lute <br />Line Masters <br />blades etc. will keep the tools working <br />Lutes <br />properly. <br />Aussie's <br />Roller <br />Having as reliable roiler on site will be <br />Grease <br />important to ensure the best possible <br />annually & <br />courts. Preventative maintenance will <br />perform <br />ensure reliable equipment. <br />scheduled <br />Preventative <br />Maintenance <br />Amenities <br />Nets, Net Posts, Coolers, Benches, etc. <br />As Needed <br />should be replaced as needed. <br />48 <br />25A-32 <br />