Laserfiche WebLink
Energy Management Solutions Incentives <br />Application for Business Customers <br />2013 - 2014 Customized Installation Report <br />DIRECTIONS: Afteryourproject is installed and operational, input the project installation commencement and completion dates in the fields <br />provided. Review the Information from yourAppiication Approval Letter. If nothing has changed, and the information in Sections 5 and 6 is <br />correct, complete and sign Section 7 on page 2 of this Installation Report (IR) Form and submit both pages to SCE at one of the addresses below. If <br />Business Incentives <br />For overnight delivery: <br />Fax: 626-633-3243 <br />Southern California Edison <br />6010 N. Irwindale Ave. <br />E-mail: Businesslncentives@sce.com <br />P.O. Box 800 <br />Irwindale, CA 91702 <br />Questions? Call 800-736-4777 <br />Rosemead, CA 91770-0800 <br />UPN #: 353-16-0500831244 <br />SA #: 3-010-7153-96 <br />Project Name: Police Dept Lighting 2 <br />Customer Name: City of Santa Ana <br />Customer's Authorized Agent: <br />Installation Commencement Date: <br />Installation Completion Date: <br />5) <br />Customized <br />SolutionsSection <br />Original Application) <br />Line # <br />Solution Code I' <br />Solution Description <br />—�! Description of Existing Equipment <br />1 <br />LT -17492 I <br />Interior LED fixture replacement (utilizing approved <br />Inmtnarinsl. <br />2 <br />LT -85834 <br />Exterior LED fixture replacements (utilizing appmved <br />3 <br />LT -78496 <br />LED Integrated Retrofit Kits <br />4 <br />5 <br />J <br />Note: If submitting more than 5 Solutions <br />complete and attach the Customized Solution page from the Multiple Site/Solution Worksheet at .scccomisolul ons. <br />Section• •s <br />(From Original ••• • <br />Energy Savings <br />Total Project Cost ($) <br />Calculated Baseline <br />Installed Energy <br />Incentive Energy $641,847.51 <br />Solution # Usage (kWh) <br />Usage (kWh) Savings (kWh) <br />Rate ($IkWh) Incentive ($) <br />1 803,629.7 <br />357,913.6 445,716.1 <br />$ 0.08 $ 35,657.29 Calculated Energy Savings Totals <br />2 31,447.0 <br />12,792.0 18,655.0 <br />$ 0.08 $ 1,492.40 494,175.3 <br />3 63,760.2 <br />33,956.0 29,804.2 <br />$ 0.08 $ 2,384.34 <br />Calculated Savings Incentives <br />4 <br />-lxs P,y,ncwAdy z pfaw-ei:l <br />5 <br />115,348.20 <br />Section 6) Pri-Peak Demand <br />Reduction (From Original <br />Application) <br />On -Peak Demand Reduction <br />On -Peak Demand Reduction (kW) <br />Calculated Baseline <br />Installed On -Peak <br />Peak Demand 60.67 <br />Solution On -Peak <br />On -Peak Demand <br />Reduction <br /># from above Demand (KW) <br />Demand (KW) Reduction (KW) <br />Incentive ($) <br />1 100.94 <br />43.95 56.99 <br />$ 8,548.50 SA# 3-010-7153-96 <br />2 <br />$ - UPN # 353-16-0500831244 <br />3 7.87 <br />4.19 3.68 <br />$ 552.00 <br />4 <br />$ NOTE: For projects requiring M&V, attach any required <br />baseline or post -installation measurements and analysis, as <br />5 <br />$ - speed in your approved M&V plan. <br />Section 5) Customized Solutions <br />(if Different from Original <br />Application) <br />r�--.._—�_— <br />Line # I Solution Code <br />____ — _—­_._ —..__ <br />Solution Description <br />---_.—__�_.� <br />Descripticn of Existing Equipment <br />1 <br />3 <br />4 - -- <br />-----�-- <br />----1 -. <br />5 <br />Note: If submitting more than 5 Solutions complete and attach the Customized Solution page of the Multiple SitelSoludon Worksheet at vxnv.sce.comisclutions. <br />