My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT LIGHTING FIXTURES CORP YARD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25C - AGMT LIGHTING FIXTURES CORP YARD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:39:08 PM
Creation date
8/30/2018 7:26:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25C
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section. <br />. Different fromOriginalApplication) <br />Energy Savings <br />Total Project Cost($) <br />_ -_ _-- — _- <br />Calculated Baseline Installed Energy incentive Energy <br />Solution # Usage (kWh) Usage (kWh) Savings (kWh) Rate ($IkWh) Incentive ($) <br />1 - - <br />_ - <br />Calculated Energy Savings Totals <br />' <br />2 <br />4 <br />Calculated Savings Incentives <br />Sectionr <br />Section <br />• Demand ' - • • Different fromOriginal <br />• r <br />On -Peak Demand Reduction <br />On•Peak_Demand Reduction (kW) <br />Calculated Baseline Installed On -Peak Peak Demand <br />Solution On -Peak On -Peak Demand Reduction <br /># from above Demand (KW) Demand (KW) Reduction (KW) Incentive ($) <br />SA P! - ,,0055214-5f-�- <br />UPN9° 353;16-0500831253 <br />NOTE: For projects requiring M&V, attach any required <br />baserine or post -installation measurenrents and analysis, as <br />specified In your approved M&V plan. <br />2 <br />.._ <br />4 <br />• • Operation <br />Check appropriate boxes: <br />No changes to the proposed solutions have been made since the Project Application Review and Approval and the Authorized agent verifies <br />that the Application approved savings calculations are correct. <br />0 Due to changes to the proposed measures, appropriate adjustments in the savings calculations have been made. <br />For measures with changes made during installation, use this section, and Sections 5 & 6 on page 2, to calculate the revised installed energy usage, <br />0 energy savings, peak demand reduction, and incentives. Attach the appropriate calculation backup: the output from the Estimation Software, <br />Calculate Energy Savings Total or the calculation sheets that document the engineering calculations. <br />To be completed only • •• retrocommissioning (Rqx) measures* <br />Attach the following supporting documentation with this Installation Report, or email it to the SCE RCx program manager: <br />Verification data as evidence of implementation. <br />Updated savings calculations, where applicable. <br />Copies of invoices for implementation, as proof of the Customer's implementation costs. <br />RCx Training Completion Form, including the training agenda, training materials, list of attendees, and measure persistence <br />strategies. <br />See the RCx Program Guidelines for more information on these Items. <br />To • - completed only •u, are requesting an HVAC• - <br />1. HVAC Permit (if required). If a permit is required for any HVAC installation/replacement, I have provided the permit number below. (If no permit <br />is required, leavethis section blank.) Permit# Agency <br />2. Contractor Certification. If a contractor was used for any HVAC installafion/replacement, this section must be completed by the contractor. <br />By checking this box, I certify I am a licensed contractor and have followed applicable permitting requirements and, if required, that the HVAC <br />L1 permit information above is correct. <br />Signature of Contractor Name (please print) Date <br />SignatureI, <br />the Customer or Authorized Agent below, certily that (i) the Energy Efficiency Solutions have been completely installed, functionally tested and proven capable of <br />operating and being maintained to perform in conformity with their design intent, and (ii) that a licensed contractor was used, where applicable, and all applicable <br />permitting requirements for this installation were followed. The installation date of operation of the Energy Efficiency Solutions and any required monitoring data <br />collection per approved M&V plan, are also certified. <br />Signature Name (please print) Me Date <br />260A 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.