My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br />CONSULTING <br />GROUP <br />www.interwastgrp.com <br />controls required to operate the wells from City's SCADA system. Budget cost was <br />approx. $3.7m <br />Garthe Water Well — Prepared plans, specifications for the drilling a water well, <br />equipped with vertical pump with 1850 -GPM capacity and 250 -hp electric motor, <br />500 lineal feet of 12 -inch PVC -C900 discharged into new Garthe reservoirs and <br />distribution system, with pumping facility to an existing storm drain line, and <br />Instrumentation to operate Including hydraulic controlled by cla-valve and <br />connected to City's existing SACAD system. Budget cost was $1.9m <br />Citywide Water Main Replacement Program —Project Included multiple locations <br />within the City limits to upgrade 6-Inh through 12 -Inch water mains, which <br />Includes new water services, fire hydrants, and PRV stations. Design Included <br />various street redesign/construction locations. Budget was $12m over six years. <br />Water System Manager <br />1995-1997 <br />City of Fullerton I CA <br />As water system manager, Thom efficiently planned, scheduled and directed the operation <br />of the City's Water Engineering Department water system, quality control and rate setting. <br />He managed the department's annual budget/expenditures and developed and <br />Implemented department goals and objectives. Thom prepared and managed design and <br />construction of CIP with budget controls, which Included the drilling/development of a <br />new water well. He effectively communicated activities with other City departments, <br />outside agencies and presented to City Council and public on related legislative water <br />issues. He also provided responsible and complex administrative support to the Director of <br />Engineering and City Manager. <br />Water Field Manager <br />1993-1995 City of Anaheim I CA <br />Thom directed, planned and organized the water production, transmission/distribution <br />maintenance and system operations programs within the Public Utilities Department to <br />support the Assistant General Manager of Water Services. He prepared the Division's <br />annual budget & expenditures to best represent the City's goals and objectives. He <br />developed training for new water operation teams and enhanced communications <br />between office and field personnel. He developed and monitored contractor <br />emergency services and general service contracts with specialty companies (privatization) <br />for a City cost savings of $360k/yr. Thom Introduced effective activities and <br />communications with other City departments and outside agencies for a cost savings of <br />$90k/yr., and provided various presentations to Public Utility Board as required. In this <br />role, Thom was accountable for staff motivation, evaluations, labor/union grievances, and <br />disciplinary action. <br />- Citywide Water Main Replacement Program — Provided oversight for water <br />replacement project at multiple locations within the City limits to upgrade 6-Inh <br />through 12 -inch water mains, which includes new water services, fire hydrants, <br />and PRV stations. Project included new lining procedures in existing water mains. <br />Design included various street redesign/construction locations. Budget of $8.5M. <br />Crescent Street Water Well — Design/build a water well to a depth of 1,200 feet <br />Including a 250 -hp electric motor and 500 lineal feet of 12 -inch PVC C-900 <br />pipeline Into the distribution system with a 1,500 GPM capacity, Including SCADA <br />connections Into City's system for fully automatic operations. Budget was $1.5m. <br />Water Trans/Distribution Manager <br />1992-1993 <br />Principal Water Engineer <br />1988-1992 <br />Associate Engineer <br />1982-1986 <br />25F-101 <br />City of Anaheim <br />City of Anaheim <br />Mesa Consolidated Water District <br />Page 147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.