Laserfiche WebLink
I <br />INTERWEST <br />CONSULTING <br />GROUP <br />www.Intarwaatgrp.com <br />256 Street Roadway & Drainage Rehabilitation, Rancho Palos Verdes - Project <br />Manager for construction of storm drain improvements and roadway <br />resurfacing along 25th Street In the City of Rancho Palos Verdes. This $500,000 <br />project Included 36" HDPE pipe, an outlet structure, several drain inlets, <br />asphalt rubber and metal beam guard rail modifications. <br />San Ramon Drainage & Landslide Stabilization, Rancho Palos Verdes - Project <br />Manager of a $4 million landslide stabilization project on private property in <br />the City of Rancho Palos Verdes. The project included construction of 36" HDPE <br />storm drain pipe, an outlet structure, over 75,000 tons of highly engineered <br />imported fill, 4" subdrains, v -ditches, landscaping and Irrigation. <br />Principal <br />2004-2009 Priority Engineering Inc. j Torrance, CA <br />As a consulting engineer, Nicole provided professional engineering services to <br />municipal and private clients. Services Included signal design, geometric design, <br />project management, traffic and parking studies. Managed a team of 12 <br />professionals. <br />Senior Engineer <br />2002-2004 City of Rancho Palos Verdes [CA <br />Nicole managed several large high-profile capital improvement projects, <br />Including museum improvements, storm drain enhancements, landslide <br />stabilization, lead remedlation, pavement rehabilitation, traffic improvements <br />and transportation management strategies. Directed and managed a host of <br />consultants and contractors. Coordinated with other City Departments on <br />complex development projects and also participated In leadership <br />development activities. <br />Associate Engineer <br />2001-2001 City of Torrance I CA <br />Nicole was the Project Manager for several capital improvement projects <br />Including water main Improvements, storm drain connections and pavement <br />rehabilitation. Managed the city's pavement management system. <br />Newton/Madison Street and Water Improvement, Torrance — Construction <br />Manager of water main construction and roadway rehabilitation on Madison <br />Street and Newton Street. This $2 million project Included water main, storm <br />drain, curb, gutter, sidewalk, and roadway improvements. <br />Assistant Engineer <br />2000-2001 City of Signal Hill j CA <br />Nicole facilitated the City's capital improvement program. Prepared project <br />plans, specifications and cost estimates. She managed several consultants and <br />contractors and coordinated construction activities with other City <br />departments. Responsible for the City's pavement management system and <br />Inspected small-scale projects within the city's rights-of-way. Successfully <br />designed two water -system modification projects and managed a CDBG funded <br />residential demolition project. <br />Annual Pavement Management/Slurry Seat Program, Signal Hill — Project <br />manager of City of Signal Hill's annual pavement maintenance program. This <br />$500,000 program Included slurry -sealing about % of City of Signal Hill's <br />residential streets. <br />25F-108 <br />Page 154 <br />