My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br />CONSULTING <br />GROUP <br />www.interwestgrp.com <br />EDUCATION <br />Bachelor of Science <br />Civil Engineering <br />California State University of Long Beach <br />California <br />REGISTRATIONS <br />C E R TI F I CA Tr O NS <br />International Code Council 18343027 <br />ICC Certified Special Soil Inspector <br />Nuclear Certified <br />ACI Certified <br />SWPPP and NPDES Certified <br />Giros Ganji, ICC <br />Construction Manager & Inspector <br />Ciros has more than 20 years of experience In construction, construction inspection, <br />geotechnical testing and design on a number of projects for local cities, government <br />agencies, and private developers. He successfully completed many Capital Improvements <br />Projects, numerous mainline underground utility projects and commercial tract <br />developments. <br />He Is an expert In flood control, sewers, drainage, AC and PCC paving, traffic control, <br />roadway excavation, soils testing, concrete Inspection and major public works projects. He <br />has been responsible for Inspecting and reviewing proper traffic control plan; detecting <br />and locating faulty materials; maintaining daily inspection reports; and preparing final <br />punch lists. He has great communication skills responding to citizen complaints and <br />providing quality customer service. In addition, he has prepared and maintained project <br />documents including labor and equipment records and labor compliance reports. Ciros is <br />familiar with construction project scheduling. He has worked very well with all members <br />of private and public agencies and was highly respected for his efforts. <br />PROJECT SPECIFIC EXPERIENCE <br />The following are projects forwhich Ciros acted as consultant project Inspector. <br />Hetzler Road Pedestrian Trail Improvements Project j City of Culver City <br />Ciros provided Inspection for construction of 13,000 SF CMU retaining walls and 15000 SF <br />of color PCC sidewalk on Hetzler road. His responsibilities included; Inspecting line grade, <br />size, elevations and locations of improvements for 5000 LF of PCC wall drain, performing <br />daily construction Inspection and recording detailed daily and picture reports, Verify <br />/authorize progress payments with contractors and Culver City project manager, <br />monitoring SWPPP and the BMPs Implementations and comply with the NPDES permit <br />and to ensure contractor compliance with contract plans and specifications. Additionally, <br />he assisted with pay quantity estimates, contract change orders, as -built drawings, and <br />attending weekly meeting & tracking construction schedules. <br />AT&T ODAS antenna (Outside Distribution Antenna System) ) City of Beverly Hills <br />Ciros performed Inspection for Installations and construction Inspection of 75 cell phone <br />antenna towers on City of Beverly Hills. Conducted an ongoing inspection of work -in - <br />process to ensure that the final product met drawings and specifications. Maintain a daily <br />field reports and as -built plan, construction photographs documenting progress on <br />problem areas and include appropriate photographs in monthly progress reports. <br />Observes work In progress to ensure that procedures followed and materials used <br />conform to specifications. Observes work in progress to ensure that procedures followed <br />and materials used conform to specifications. Inspect storm pipes, sidewalks, wheelchair <br />ramps, sewer and street lights a according to plan. <br />Fire Station 711 City of Fontana <br />Responsible for conducting detail Inspections of construction work to ensure contract <br />compliance with plans and specification. Inspecting of installation new sewer and water <br />main and storm drain installations. Writing weekly inspection reports to ensuring <br />complying with erosion control and storm water management plans. Completed and <br />maintained records pertaining to construction progress Including daily reports, monthly <br />pay estimates and job expenditures. Check and inspecting irrigation and landscaping for <br />Miller park east of project. Project Cost: $19 million (design -build). <br />25F-123 <br />Page 169 <br />
The URL can be used to link to this page
Your browser does not support the video tag.