INTERWEST
<br />CONSULTING
<br />GROUP
<br />www.Intorwestgrp.com
<br />Project Engineer Project Coordinator
<br />2002-2012 Metro Builders & Engineers Group, Ltd
<br />Julio was responsible for the preparation of Submittals, RFI's, Change Orders,
<br />subcontracts, dally project reports, and weekly safety meetings. He managed and oversaw
<br />entire projects from start to finish.
<br />Field Safety Officer
<br />2002-2016 Metro Builders & Engineers Group, Ltd
<br />In this position, Julio oversaw all health and safety aspects of company operations for the
<br />welfare of all employees and subcontractors. This included scheduling necessary employee
<br />safety and injury prevention trainings; ensuring the proper use of all necessary Personal
<br />Protective Equipment (PPE); and safely operating all heavy equipment, light equipment
<br />and tools (power, pneumatic, and powder actuated). This position also Involved
<br />performing Incident Investigation. The report was created immediately after an incident
<br />when improper safety procedures were reported or an Incident or accident occurred. This
<br />also required the maintenance of all project and employee Incident records and assisting
<br />project superintendents with all aspects of company safety programs and project specific
<br />IIPPs. Each project Included but was not limited to: Weekly Safety Tool Box Meetings, Daily
<br />Inspections, Job Hazard Analysis and all components of planning, communication and
<br />coordination. Programs Used: MS Office 2012 (Excel, Word, Access, Project, Outlook,
<br />OneNote and Power Point), AutoCAD 2007 & 2012 LT & Adobe Professional.
<br />Engineering Draftsman
<br />2000-2001 Lambco Engineering
<br />As an Engineering Draftsman, Julio's responsibilities Involved the production and
<br />coordination of traffic control plans and the re-routing of underground telecommunication
<br />utility lines. This work was designed using AutoCAD standards and menus for Level 3 and
<br />GST Telecom, now Time Warner Telecom. Engineering Included: traffic control plans in
<br />accordance to County, City, and Caltrans requirements. Also included the AutoCAD
<br />development of construction plans; site plan, general notes, details of manholes, bore
<br />holes, barrel vaults, and bridges 3-D, and As -built plans. These drawings noted stationing
<br />of street and location of all existing underground utilities such as; water lines, gas lines,
<br />sewer lines, telephone lines, cable lines, storm drains and proposed trench. Programs
<br />used: AutoCAD R14 and 2K, Microsoft Office 98 & 2K, Microsoft maps & trips 2K, Digital
<br />Thomas bras. Guide, and ArcVIew.
<br />Draftsman
<br />1997-2000 David H. Lee &Associates, Inc.
<br />Julio's duties included the coordination and maintenance of the Drafting Department;
<br />geological identification of Cllentjob sites; field measurements of existing floor plans; floor
<br />level surveys (contour mapping); boring log profiles; Floor level survey performed (with a
<br />manometer); and AutoCAD drafting of site plan, Geotechnical map, floor plan, floor level
<br />survey, contour map, water usage graph, and boring logs. programs Used: AutoCAD LT, 97,
<br />98, & 2K, Microsoft Office 98, Surfer, Adobe Photoshop, & Digital Thomas Bros. Guide.
<br />HIGHLIGHTED PROJECTS
<br />• 2760A Berth 142 Crane Maintenance Building, Port of Los Angeles- $6.5M
<br />• C0990 Crenshaw -LAX Advanced Utility Relocations, LA Metropolitan
<br />Transportation Authority — $7.8M
<br />• C1020 Union Station West Entry Skylight, LA Metropolitan Transportation
<br />Authority—$410K
<br />• C1027 Division 9 Fire Protection System, LA Metropolitan Transportation
<br />Authority — $7601(
<br />• Pacoima Dam Hoist and Operator House for Cableway, City of Los Angeles Public
<br />Works - $1M
<br />25F-128
<br />Page 174
<br />
|