Laserfiche WebLink
City or Santa Ana <br />Engineering, Technical and Administrative Support Services <br />REP No.: 18.047 <br />PENCOENG <br />r�was.,smm--f�-1 <br />EWA <br />TWO 5 <br />SCOPE OF SERVICES & SCHEDULE <br />PENCO's Scope of Services has been addressed within the understanding of need on page 2 of this <br />proposal. A detailed schedule is not applicable at this time and can be provided upon selection. <br />Page 10 <br />25F-149 <br />Scope <br />of Services <br />Relevant Projects <br />MM <br />a <br />Zi <br />;,..' <br />o <br />c <br />5. <br />' <br />ro <br />in <br />€ <br />� . <br />m <br />Cdr <br />o. <br />Com <br />V.W.' <br />ElL+-�. <br />a'rn <br />2�. <br />m'•�'`o <br />City of Moreno Valley NPDES Consulting and WQMP Plan <br />Check Services CWE <br />CWE is providing on-call stormwater management services to ensure compliance with the Riverside County <br />Municipal NPDES Stormwater Permit, Construction General Permit, and bacteria and nutrient Total Maximum <br />Daily Loads for the Santa Ana River Watershed. Performed over 100 plan check reviews of Preliminary <br />and Final WQMPs associated with new development and significant redevelopment projects, program <br />management, regulatory support, public education, preparation of stormwater guidance materials, stormwater <br />compliance Inspections, municipal staff training, and review and recommendation of modifications to the <br />City's standard plans, details, codes, and ordinances to ensure compliance. <br />Reference: Hoang Nguyen, Associate Engineer, (951) 413-3216 <br />Dates of Service: 2011 - On -Goin <br />Beach Boulevard Medians City of Stanton DVD <br />Beach Boulevard is a main thoroughfare in Stanton running for three miles, the entire length of the city. <br />The design team coordinated with Caltrans and city departments for the median landscape improvements, <br />creating a bold statement. <br />Reference: Jim Box, City Manager, (714) 379-9222 x277, JBox@ci.stanton.ca.us <br />Dates of Service: 2016 <br />Harbor Boulevard Bike Trail City of Costa Mesa DVD <br />A main commercial thoroughfare just off the 405 freeway and gateway into the city, street Improvements were <br />designed to enhance the overall experience of the street whether by driving in a car or walking through the <br />commercial district on the sidewalk. <br />Reference: Baltazar Mejia, Senior Engineer, (714) 754-5291, baltezar.mejia@costamesace.gov <br />Dates of Service: 2016 <br />TWO 5 <br />SCOPE OF SERVICES & SCHEDULE <br />PENCO's Scope of Services has been addressed within the understanding of need on page 2 of this <br />proposal. A detailed schedule is not applicable at this time and can be provided upon selection. <br />Page 10 <br />25F-149 <br />