My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
25F - AGMT ENGINEERING AND TECH SUPPORT SVCS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:43:13 PM
Creation date
8/30/2018 7:26:44 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
9/4/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ban ve ccorwa <br />-0 9h.. <br />Gary Solsona, PE, QSD <br />Senior Staff Manager/Project Manager <br />City of Santa Ana <br />Engineering, Technical and Administrative Support Services <br />RFP No.: 18-047 <br />Education: <br />BS, Civil Engineering, California State Polytechnic University, Pomona, 2001 <br />Licenses & Certifications: <br />Professional Civil Engineer, CA #68420 <br />Qualified SWPPP Developer / Practitioner #234666 <br />Years Firm/Exp.: 1/16 <br />Gary has 16 years of civil engineering experience in public works design, consisting of award-winning <br />roadway widening, street rehabilitation and intersection improvements; sound wall and retaining wall <br />design, preparation of traffic control plans and project study reports, and Is recognized In the Industry as <br />an ADA design specialist. His proactive approach is carried out seamlessly through project management, <br />engineering design development, and construction support services to public agencies throughout Southern <br />California and he has a proven track record in providing innovative, cost-saving, and sustainable solutions <br />(such as alternative pavement rehabilitation methods, including full depth reclamation and cold-in-place- <br />recyciing) on numerous street Improvement projects for major arterials and residential streets. <br />RELEVANT EXPERIENCE <br />Gary served as Project Manager and/or Project Engineer for the following relevant projects: <br />• City of Santa Ana On -Call Plan Check Services <br />• Anaheim Modjeska Park Underground Storm Water Detention and Infiltration System, City of Anaheim <br />• Sunset Strip Beautification, West Hollywood, CA* <br />• Valencia Drive Street Reconstruction, Fullerton, CA* <br />• Berkeley Avenue Street Reconstruction, Fullerton, CA • <br />• Town Center Infrastructure Improvements, Phases 1 & 2, Yorba Linda, CA <br />• ADA Ramp Improvements, Phases 9 & 10, Lake Forest, CA* <br />• Nutwood Avenue & Chapman Avenue Street Rehabilitation, Fullerton, CA* <br />• 8th Street Improvements, Hermosa Beach, CA* <br />• Bastanchury Road Rehabilitation, Yorba Linda, CA* <br />• Commonwealth Avenue Street and Sewer Improvements, Fullerton, CA* <br />• Work performed prior to PENCO <br />Page R1 <br />25F-152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.